Power Reactor Status Report for October 13, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 0 | 09/23/2007 | DEFUELED | ||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 23 | SHUTTING DOWN FOR REFUELING OUTAGE | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | NO. 371 (345KV) LINE OOS FOR PLANNED MAINTENANCE | |||
| Millstone 3 | 100 | NO. 371 (345KV) LINE OOS FOR PLANNED MAINTENANCE | |||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 94 | 'B' CONDENSATE BOOSTER PUMP OOS FOR EMERGENT MAINTENANCE | * | ||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 0 | 09/23/2007 | REFUELING OUTAGE | ||
| Pilgrim 1 | 100 | * | |||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | POWER REDUCTION THREAT DUE TO GRID WORK IN NEW ENGLAND UNTIL JANUARY | |||
| Susquehanna 1 | 0 | 10/12/2007 | TECH SPEC REQUIRED SHUTDOWN DO TO CONTROL ROD FRICTION | * | |
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 93 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Vermont Yankee | 89 | ADJUSTING POWER BASED UPON PRIMARY PLANT CHEMISTRY |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 10/12/2007 | REACTOR SCRAM DUE TO TURBINE TRIP. SEE EN #43718. | * | 1 |
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 0 | 09/14/2007 | DEFUELED | ||
| Crystal River 3 | 100 | ||||
| Farley 1 | 0 | 09/28/2007 | DEFUELED | ||
| Farley 2 | 100 | ||||
| Harris 1 | 0 | 09/28/2007 | REFUELING OUTAGE | * | |
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 0 | 09/08/2007 | REFUELING OUTAGE | ||
| North Anna 2 | 100 | ||||
| Oconee 1 | 32 | INCREASING POWER LOWERED POWER TO ADD OIL TO RCPS | * | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 0 | 09/30/2007 | DEFUELED | * | |
| Sequoyah 1 | 0 | 10/03/2007 | YELLOW GRID RISK DEFUELED | ||
| Sequoyah 2 | 100 | YELLOW GRID RISK | |||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 1 | STARTUP IN PROGRESS - SOURCE RANGE PHYSICS TESTING IN PROGRESS | * | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Vogtle 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 0 | 10/01/2007 | DEFUELED | ||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 0 | 09/14/2007 | DEFUELED | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
| Dresden 3 | 100 | * | |||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 0 | 09/29/2007 | REFUELING OUTAGE | ||
| Kewaunee | 5 | 5-MINUTE HOLD IN OPERATING MODE BEFORE INCREASING POWER | * | ||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 0 | 09/09/2007 | REFUELING OUTAGE | * | |
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | 345 KV LINE 121 OOS | |||
| Point Beach 2 | 100 | 345 KV LINE 121 OOS | |||
| Prairie Island 1 | 43 | REDUCING POWER TO 40% FOR TURBINE STOP VALVE SURVEILLANCE TESTING | * | ||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 3 | BRIEFING COMPLETED FOR POWER ASCENSION - WILL INCREASE POWER SHORTLY | * | ||
| Palo Verde 3 | 0 | 09/29/2007 | REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS | * | |
| River Bend 1 | 100 | ||||
| San Onofre 2 | 99 | STEAM GENERATOR LIMITATIONS | |||
| San Onofre 3 | 0 | 10/09/2007 | MIDCYCLE MAINTENANCE OUTAGE | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 10/08/2007 | MIDCYCLE OUTAGE | ||
| Wolf Creek 1 | 100 |