Power Reactor Status Report for August 11, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 99 | INCREASING POWER TO 100% | * | ||
| Oyster Creek | 100 | * | |||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 98 | COASTDOWN TO REFUELING OUTAGE | |||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | POWER SUPPLY ALERT | |||
| Browns Ferry 2 | 91 | CCW PUMP OUT OF SERVICE, POWER SUPPLY ALERT | * | ||
| Browns Ferry 3 | 99 | LEAK ON FW FLOW INDICATOR, POWER SUPPLY ALERT | * | ||
| Brunswick 1 | 100 | * | |||
| Brunswick 2 | 100 | * | |||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | * | |||
| Farley 1 | 100 | ||||
| Farley 2 | 92 | RCP OIL LEVEL LOW-RAMPED DOWN TO 20% TO ADD OIL AND GOING BACK UP | * | ||
| Harris 1 | 100 | * | |||
| Hatch 1 | 95 | REDUCED LOAD TO MAINTAIN CONDENSATE TEMPERATURE | * | ||
| Hatch 2 | 85 | INCREASING POWER, HOT WEATHER CONDITIONS, NOTICE OF HIGH LOAD CONDITIONS | * | ||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 90 | DOWN POWER TO REMOVE CIRC. WATER PUMP | * | ||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | POWER SUPPLY ALERT, TRANSMISSION ALERT 1 DUE TO SYSTEM LOAD | * | ||
| Sequoyah 2 | 100 | POWER SUPPLY ALERT, TRANSMISSION ALERT 1 DUE TO SYSTEM LOAD | * | ||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY, NO GRID INSTABILITY BUT HIGH LOADS, REPLACING 3 PHASES OF XFORMER HARDWIRED TO 230 KV BUS 1, USING SAT FOR POWER | * | ||
| Vogtle 2 | 99 | 100% ELECTRICAL CAPABILITY, NO GRID INSTABILITY BUT HIGH LOADS, REPLACING 3 PHASES OF XFORMER HARDWIRED TO 230 KV BUS 1, USING "B" DIESEL FOR POWER | * | ||
| Watts Bar 1 | 99 | CONDENSER BACK PRESSURE CONCERNS; POWER SUPPLY/TRANSMISSION ALERT |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | * | ||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 95 | TURBINE VALVE TESTING | * | ||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 99 | 100% ELECTRICAL CAPABILITY. | |||
| Quad Cities 2 | 98 | 100% ELECTRICAL CAPABILITY. |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 68 | TURBINE VALVE TESTING | * | ||
| Diablo Canyon 1 | 0 | 08/10/2007 | S/D TO REPAIR TURBINE STOP VALVE PROBLEM | * | |
| Diablo Canyon 2 | 100 | 1 OF 3 500KV LINES TO GO OOS ON 8/14 | * | ||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 70 | ROD SEQUENCE EXCHANGE AND TURBINE VALVE TESTING | * | ||
| San Onofre 2 | 95 | INCREASING FOLLOWING TURBINE VALVE TESTING | * | ||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |