Power Reactor Status Report for May 14, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | * | |||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | * | |||
| Calvert Cliffs 2 | 100 | * | |||
| FitzPatrick | 100 | ||||
| Ginna | 95 | REDUCING POWER FOR OFFSITE SWITCHYARD MAINTENANCE | * | ||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | MAINTENANCE ON FEEDER 95891 | * | ||
| Indian Point 3 | 100 | MAINTENANCE ON FEEDER 95891 | * | ||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 0 | 04/07/2007 | REFUELING OUTAGE | ||
| Nine Mile Point 1 | 100 | 345 KV LINE 8 MAINT 5/14-17 | * | ||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | SWITCHYARD BREAKER 169 OOS UNTIL 23MAY07 | |||
| Susquehanna 1 | 100 | ||||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 0 | 05/13/2007 | REFUELING OUTAGE | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/03/1985 | MAINTENANCE OUTAGE TAGOUT OF 500KV BUS 1 & 500KV TRINITY 1 REMOVING 500KV MADISON 1 THIS AM | * | |
| Browns Ferry 2 | 100 | TAGOUT OF 500KV BUS 1 & 500KV TRINITY 1 REMOVING 500KV MADISON 1 THIS AM | * | ||
| Browns Ferry 3 | 100 | TAGOUT OF 500KV BUS 1 & 500KV TRINITY 1 REMOVING 500KV MADISON 1 THIS AM | * | ||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 0 | 04/09/2007 | REFUELING OUTAGE - INVESTIGATING RCP SEAL | ||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 0 | 03/10/2007 | REFUELING OUTAGE. STUCK CONTROL ROD (H8) | * | |
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 0 | 04/27/2007 | REFUELING IN PROGRESS | ||
| Oconee 3 | 100 | ||||
| Robinson 2 | 30 | HOLDING FOR FLUX MAP ANALYSIS | * | ||
| Saint Lucie 1 | 0 | 04/01/2007 | REFUELING OUTAGE | ||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY. | |||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 | 161KV HYDRO SWITCHYARD MAINTENANCE | * |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 94 | INCREASING POWER | * | ||
| Byron 1 | 100 | * | |||
| Byron 2 | 95 | HOLDING FOR FUEL CONDITIONING | |||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | * | |||
| Davis-Besse | 100 | ||||
| Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 0 | 05/08/2007 | APPROACHING CRITICALITY | * | |
| Perry 1 | 10 | GENERATOR OFFLINE- INVESTIGATING A TURBINE TRIP. | * | ||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | * | |||
| Prairie Island 1 | 0 | 05/11/2007 | FEEDWATER PUMP REPAIR IN PROGRESS | ||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 0 | 05/04/2007 | REFUELING OUTAGE | ||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 46 | INCREASING POWER | * | ||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | * | |||
| Columbia Generating Station | 0 | 05/12/2007 | REFUELING OUTAGE - ADDING NOBLE METAL | ||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | * | |||
| Diablo Canyon 1 | 0 | 04/30/2007 | DEFUELED - ONLY 1 OFFSITE SOURCE - TRANSFORMER MAINT | ||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 80 | REDUCED POWER FOR CONDENSER CLEANING | * | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 93 | INCREASING POWER AFTER FEEDWATER PUMP REPAIR | * | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
| San Onofre 3 | 22 | INCREASING POWER AFTER MAINTENANCE WORK | * | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021