Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 0 | 04/06/2007 | SHUTDOWN DUE TO TRANSFORMER ISSUE; UNIT ON RHR COOLING; STEAM GENERATORS #33 AND 34 ISOLATED; EXPECT AUX FEED BACK ON 4/19 | * | |
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | 345 KV LINE OOS (LINE #371) AND SOUTH BUS OUTAGE; IN PLANT TS FOR OFFSITE SOURCES | * | ||
Millstone 3 | 0 | 04/07/2007 | 345 KV LINE OOS (LINE #371) AND SOUTH BUS OUTAGE. | * | |
Nine Mile Point 1 | 100 | * | |||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 0 | 04/06/2007 | REFUELING OUTAGE | ||
Salem 1 | 1 | CRITICAL | * | ||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | GENERATOR VOLTAGE REGULATOR IN MANUAL. | * | ||
Susquehanna 2 | 76 | GENERATOR VOLTAGE REGULATOR IN MANUAL. | * | ||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | |||
Browns Ferry 2 | 35 | SYNCHED AT 0614 ON 4/18 | * | ||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 39 | SYNCHED AT 1050 ON 4/18 | * | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 0 | 04/09/2007 | DEFUELED | * | |
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 0 | 03/10/2007 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 03/17/2007 | HEATING UP RCS | * | |
Oconee 1 | 100 | ||||
Oconee 2 | 98 | COASTDOWN TO REFUELING OUTAGE - WILL BE REDUCING POWER AT APPROX 1%/24 HRS UNTIL RFO IS ENTERED ON 4/28 | * | ||
Oconee 3 | 100 | ||||
Robinson 2 | 0 | 04/06/2007 | DEFUELED | ||
Saint Lucie 1 | 0 | 04/01/2007 | DEFUELED | ||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY. | |||
Vogtle 2 | 0 | 03/03/2007 | REFUELING OUTAGE | ||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | POST TRIP CONTINGENCIES IN EFFECT AT 0500 HRS DUE TO POTENTIAL DEGRADED VOLTAGE | * | ||
Byron 2 | 0 | 04/01/2007 | POST TRIP CONTINGENCIES IN EFFECT AT 0500 HRS DUE TO POTENTIAL DEGRADED VOLTAGE | * | |
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | * | |||
Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 0 | 03/13/2007 | REFUELING OUTAGE | ||
Palisades | 100 | WILL REPLACE SWITCHYARD BATTERIES WITHIN THE NEXT 72 HRS | * | ||
Perry 1 | 0 | 04/01/2007 | REFUELING OUTAGE | ||
Point Beach 1 | 0 | 03/31/2007 | RELOADING FUEL | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | |||
Prairie Island 2 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY. | |||
Quad Cities 1 | 82 | COASTDOWN TO REFUELING OUTAGE | * | ||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 93 | COASTDOWN TO REFUELING OUTAGE | * | ||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 0 | 04/01/2007 | DEFUELED | ||
Columbia Generating Station | 94 | COASTDOWN TO REFUELING OUTAGE | |||
Comanche Peak 1 | 0 | 02/24/2007 | COMING OUT OF A REFUELING OUTAGE | * | |
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 98 | HOLDING POWER FOR THE NEXT 24 HRS PRIOR TO PERFORMING ROD PATTERN ADJUSTMENT | * | ||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 0 | 04/12/2007 | MAINTENANCE OUTAGE TO REPAIR TURBINE LUBE OIL PROBLEM - RCS COOLDOWN TO MODE 5 IN PROGRESS | * | |
River Bend 1 | 86 | INCREASING POWER TO 100% | * | ||
San Onofre 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 03/25/2007 | CORE RELOAD COMPLETE | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |