Power Reactor Status Report for October 8, 2005

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 87   CONTROL ROD PATTERN ADJUSTMENT *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 09/29/2005 REFUELING OUTAGE    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 0 09/19/2005 REFUELING OUTAGE    
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 89   CONTROL ROD PATTERN ADJUSTMENT *  
Susquehanna 2 100        
Three Mile Island 1 99   COASTDOWN TO REFUELING OUTAGE    
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 76   COASTDOWN TO REFUELING OUTAGE    
Harris 1 100        
Hatch 1 80   CONTROL ROD PATTERN ADJUSTMENT *  
Hatch 2 100        
McGuire 1 0 09/17/2005 REFUELING OUTAGE    
McGuire 2 100        
North Anna 1 99     *  
North Anna 2 0 10/01/2005 REFUELING OUTAGE    
Oconee 1 100        
Oconee 2 85   COASTDOWN TO REFUELING OUTAGE *  
Oconee 3 100        
Robinson 2 0 09/16/2005 DEFUELED    
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 0 09/17/2005 REFUELING OUTAGE    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 0 09/25/2005 REFUELING OUTAGE - RELOAD COMPLETE *  
Clinton 95   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 96   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 0 09/23/2005 REFUELING OUTAGE    
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 63   POWER SUPPRESSION TESTING *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 10/04/2005 REFUELING OUTAGE    
Arkansas Nuclear 2 100        
Callaway 0 09/16/2005 DEFUELED    
Columbia Generating Station 100        
Comanche Peak 1 96   COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 2 74   TURBINE VALVE TESTING *  
Cooper 80   CONTROL ROD PATTERN ADJUSTMENTS *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 0 09/18/2005 REFUELING OUTAGE    
Palo Verde 1 0 10/07/2005 SHUTDOWN FOR REFUELING OUTAGE *  
Palo Verde 2 100        
Palo Verde 3 85   INCREASING POWER *  
River Bend 1 100        
San Onofre 2 99   100% ELECTRICAL CAPABILITY    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 0 10/01/2005 REFUELING OUTAGE    
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021