Power Reactor Status Report for June 18, 2005
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 34 | INCREASING POWER | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 46 | REDUCED POWER FOR FEED PUMP MAINTENANCE | * | ||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 84 | REDUCED POWER DUE TO TURBINE AUXILIARY HEAT EXCHANGER CLEANING | * | ||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | ||||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 82 | REDUCED POWER DUE TO MOTOR REPAIR ON CIRCULATING PUMP | * | ||
| Farley 1 | 74 | REDUCED POWER DUE TO MISALIGNMENT OF CONTROL RODS - UNDER EVALUATION | * | ||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 58 | REDUCING POWER TO 7-8% AND HOLDING IN MODE 1 WITH THE GENERATOR OFFLINE FOR VOLTAGE REGULATOR REPAIRS | * | ||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | |||
| Duane Arnold | 96 | 100% ELECTRICAL CAPABILITY | * | ||
| Fermi 2 | 100 | ||||
| Kewaunee | 0 | 02/20/2005 | RESOLVING AUXILIARY FEEDWATER ISSUES | ||
| La Salle 1 | 100 | ||||
| La Salle 2 | 80 | REDUCING POWER TO 70-75% FOR MAINTENANCE | * | ||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 0 | 04/01/2005 | REFUELING OUTAGE | ||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 0 | 06/17/2005 | AUTOMATIC REACTOR SCRAM DUE TO EHC MALFUNCTION - SEE EVENT #41782 - EHC REPAIRS IN PROGRESS | * | 1 |
| Quad Cities 2 | 95 | STEAM DRYER MONITORING | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 0 | 06/16/2005 | TECH SPEC REQUIRED SHUTDOWN - SEE EN # 41781 - RESTART PREPARATIONS IN PROGRESS | * | |
| Columbia Generating Station | 0 | 06/15/2005 | REACTOR AUTOMATIC SCRAM - SEE EN # 41779 | * | |
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 70 | REDUCED POWER FOR PLANNED ROD ADJUSTMENT | * | ||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 72 | HOLDING POWER FOR REPAIR OF HIGH PRESSURE HEATER TRAIN | * | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 99 | POWER LIMITED WHEN USING ULTRASONIC FLOW METER (UFM) | |||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 0 | 05/22/2005 | HEATUP ON HOLD DUE TO PRESSURIZER ISSUES | ||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021