Power Reactor Status Report for May 21, 2005

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 63   SCHEDULED WATERBOX CLEANING *  
Limerick 2 100        
Millstone 2 75   INCREASING POWER *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 22   DRYWELL ENTRY FOR POTENTIAL STEAM LEAK *  
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 99   TURBINE VALVE ADJUSTMENTS *  
Seabrook 1 70   MAIN FEEDPUMP MAINTENANCE *  
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 05/07/2005 DEFUELED *  
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 60   REPAIR FEEDWATER HEATER VALVE *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 04/24/2005 REFUELING OUTAGE    
Summer 0 04/23/2005 REFUELING OUTAGE    
Surry 1 100        
Surry 2 0 04/23/2005 REFUELING OUTAGE    
Turkey Point 3 100        
Turkey Point 4 0 04/10/2005 REFUELING OUTAGE    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 95   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 92   REDUCED POWER FOR WATERBOX TUBE REPAIRS *  
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 94   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 0 02/20/2005 RESOLVING AUXILIARY FEEDWATER ISSUES    
La Salle 1 100        
La Salle 2 66   LOAD FOLLOW *  
Monticello 100        
Palisades 100     *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 0 04/01/2005 REFUELING OUTAGE    
Prairie Island 1 100        
Prairie Island 2 0 04/15/2005 REFUELING OUTAGE *  
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 84   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 0 05/06/2005 REFUELING OUTAGE    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 02/26/2005 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 99     *  
Palo Verde 2 12   PREPAIRING TO INCREASE TO 19% POWER *  
Palo Verde 3 99     *  
River Bend 1 100        
San Onofre 2 100     *  
San Onofre 3 95   INCREASING POWER FOLLOWING POWER REDUCTION FOR VALVE TESTING *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 04/16/2005 CONTAINMENT LEAK RATE TESTING *  
Wolf Creek 1 99   HOLDING FOR INSTRUMENT CALIBRATIONS *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021