The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 11, 2005

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 04/03/2005 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 14   INCREASING POWER *  
Hope Creek 1 83   INCREASING POWER *  
Indian Point 2 100        
Indian Point 3 96   INCREASING POWER *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 04/08/2005 ENTERING REFUELING OUTAGE    
Millstone 3 100        
Nine Mile Point 1 0 03/20/2005 DEFUELED    
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 89   COASTDOWN TO REFUELING OUTAGE *  
Salem 1 83   REDUCED POWER DUE TO RIVER GRASS AT INTAKE TO CIRC WATER PUMPS    
Salem 2 0 04/05/2005 REFUELING OUTAGE    
Seabrook 1 0 03/31/2005 DEFUELED    
Susquehanna 1 100        
Susquehanna 2 0 04/10/2005 TECH SPEC REQUIRED SHUTDOWN DUE TO FAILED 125V DC BATTERY CHARGER. SEE EVENT # 41585 *  
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 0 03/21/2005 REFUELING OUTAGE    
Browns Ferry 3 98     *  
Brunswick 1 100        
Brunswick 2 0 04/09/2005 AUTOMATIC REACTOR SCRAM DUE TO LOW REACTOR VESSEL WATER LEVEL. SEE EVENT # 41582.    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 74   INCREASNG POWER *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 03/01/2005 STARTUP PREPARATIONS IN PROGRESS    
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 04/08/2005 ENTERING REFUELING OUTAGE    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 0 04/09/2005 AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP ON LOW AUTO STOP OIL PRESSURE SWITCHES. SEE EVENT # 41583.    
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 0 04/10/2005 ENTERING REFUELING OUTAGE *  
Vogtle 1 67   INCREASING POWER *  
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100     *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 92   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/26/2005 REFUELING OUTAGE *  
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 0 03/28/2005 REFUELING OUTAGE    
Fermi 2 100        
Kewaunee 0 02/20/2005 SHUTDOWN TO RESOLVE AUXILIARY FEEDWATER ISSUE    
La Salle 1 100        
La Salle 2 100        
Monticello 1   REACTOR <1% POWER AND HOLDING FOR TEST *  
Palisades 100        
Perry 1 0 02/21/2005 REFUELING OUTAGE    
Point Beach 1 100        
Point Beach 2 0 04/01/2005 REFUELING OUTAGE    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 0 03/21/2005 REFUELING OUTAGE    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 13   HOLDING FOR TURBINE TEST *  
Callaway 100        
Columbia Generating Station 90   REDUCED POWER FOR ROD SHUFFLE *  
Comanche Peak 1 100        
Comanche Peak 2 0 03/26/2005 DEFUELED    
Cooper 100     *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 02/26/2005 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 04/01/2005 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 100        
South Texas 1 0 03/08/2005 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 04/08/2005 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021