The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for December 6, 2003

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 12/05/2003 SHUTDOWN FOR PLANNED MAINTEANCE.. *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 94   TESTING IN PROGRESS *  
Millstone 2 100     *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 93   INCREASING POWER AFTER REACTOR FEED PUMP SWAP *  
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 85   INCREASING POWER AFTER SWITCHYARD ISSUES. *  
Salem 2 99        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 50   INCREASING POWER *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 94   100% ELECTRICAL CAPABILITY    
Brunswick 2 53   REDUCED POWER FOR REACTOR FEED PUMP MAINTENANCE *  
Catawba 1 0 11/07/2003 REFUELING OUTAGE    
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 73   COASTDOWN TO REFUELING OUTAGE. INCREASING POWER AFTER ROD SHUFFLE. *  
Hatch 2 99        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 09/19/2003 REFUELING OUTAGE    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 19   INCREASING POWER *  
Sequoyah 1 100        
Sequoyah 2 0 11/09/2003 REFUELING OUTAGE *  
Summer 100        
Surry 1 100        
Surry 2 100     *  
Turkey Point 3 22   GOING OFF LINE FOR GOVERNOR VALVE REPAIR. *  
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 50   INCREASING POWER *  
Byron 1 100        
Byron 2 100        
Clinton 30   HOLDING FOR RECIRC PUMP TROUBLESHOOTING *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 02/15/2002 MAINTENANCE OUTAGE    
Dresden 2 96   100% ELECTRICAL CAPABILITY    
Dresden 3 0 12/05/2003 REACTOR <1% AND SHUTTING DOWN FOR MAINTENANCE *  
Duane Arnold 82   HOLDING FOR CHEMISTRY *  
Fermi 2 62   REDUCED POWER FOR BY-PASS VALVE TESTING *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 85   HOLDING DUE TO STEAM DRYER CONCERNS    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 11/15/2003 MAIN XFMR REPAIRS    
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 99   100% ELECTRICAL CAPABILITY    
Cooper 83   INVESTIGATING MAIN FEEDWATER CONTROL PROBLEM    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 99   T-HOT LIMITED    
Palo Verde 2 0 09/26/2003 REFUELING OUTAGE    
Palo Verde 3 99   T-HOT LIMITED    
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021