Power Reactor Status Report for November 3, 2003
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 97 | REDUCED POWER FOR TESTING | * | ||
Limerick 2 | 100 | ||||
Millstone 2 | 0 | 10/11/2003 | REFUELING OUTAGE | ||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 0 | 10/09/2003 | REFUELING OUTAGE | ||
Seabrook 1 | 48 | HOLDING AT POWER FOR MAINTENANCE | * | ||
Susquehanna 1 | 100 | ||||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 0 | 10/18/2003 | DEFUELED | ||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
Browns Ferry 2 | 0 | 10/28/2003 | MAINTENANCE OUTAGE | ||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 93 | 100% ELECTRICAL CAPABILITY | |||
Brunswick 2 | 96 | 100% ELECTRICAL CAPABILITY | |||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 10/03/2003 | REFUELING OUTAGE | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 98 | POWER LIMITED BY CONTROL VALVE FUNCTION | |||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 0 | 09/19/2003 | DEFUELED | ||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | * | |||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 0 | 10/11/2003 | DEFUELED | ||
Surry 1 | 100 | ||||
Surry 2 | 0 | 09/18/2003 | REFUELING | ||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 0 | 10/05/2003 | REFUELING OUTAGE | ||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 85 | COASTDOWN TO REFUELING OUTAGE | |||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 93 | 100% ELECTRICAL CAPABILITY | * | ||
D.C. Cook 1 | 0 | 10/17/2003 | DEFUELED | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 0 | 02/15/2002 | MAINTENANCE OUTAGE | ||
Dresden 2 | 0 | 10/14/2003 | REFUELING OUTAGE | ||
Dresden 3 | 97 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 9 | PLANT SHUTTING DOWN FOR CONDENSER TUBE LEAK REPAIR | * | ||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 0 | 10/03/2003 | EXITING REFUELING OUTAGE | ||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 99 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 77 | HOLDING FOR XENON STABLIZATION | * | ||
Cooper | 65 | INCREASING POWER | * | ||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 30 | HOLDING FOR TEST | * | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 98 | T-HOT LIMITED | |||
Palo Verde 2 | 0 | 09/26/2003 | DEFUELED | ||
Palo Verde 3 | 99 | T-HOT LIMITED | |||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | ||||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 0 | 10/19/2003 | DEFUELED | ||
Wolf Creek 1 | 0 | 10/18/2003 | DEFUELED |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021