The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 31, 2003

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 80   REDUCED POWER DUE TO SOLAR MAGNETIC DISTURBANCES - WILL REASSESS HOLD AT 1100 EST AND, IF NO PROBLEMS, ESCALATE POWER *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 10/11/2003 REFUELING OUTAGE    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 80   REDUCED POWER DUE TO SOLAR MAGNETIC DISTURBANCES - WILL REASSESS HOLD AT 1100 EST AND, IF NO PROBLEMS, ESCALATE POWER *  
Salem 2 0 10/09/2003 REFUELING OUTAGE    
Seabrook 1 94   2-HOUR REACTOR ENGINEERING HOLD - WILL INCREASE POWER LATER TODAY *  
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 0 10/18/2003 DEFUELED    
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 0 10/28/2003 MAINTENANCE OUTAGE    
Browns Ferry 3 100        
Brunswick 1 93   100% ELECTRICAL CAPABILITY    
Brunswick 2 96   100% ELECTRICAL CAPABILITY    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 10/03/2003 REFUELING OUTAGE    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 98   POWER LIMITED BY CONTROL VALVE FUNCTION    
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 09/19/2003 DEFUELED    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 10/11/2003 DEFUELED    
Surry 1 100        
Surry 2 0 09/18/2003 REFUELING    
Turkey Point 3 100        
Turkey Point 4 0 10/05/2003 REFUELING OUTAGE    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100     *  
Braidwood 2 86   COASTDOWN TO REFUELING OUTAGE *  
Byron 1 100        
Byron 2 100        
Clinton 47   OFFGAS INLEAKAGE REPAIRS *  
D.C. Cook 1 0 10/17/2003 DEFUELED    
D.C. Cook 2 100        
Davis-Besse 0 02/15/2002 MAINTENANCE OUTAGE    
Dresden 2 0 10/14/2003 REFUELING OUTAGE    
Dresden 3 97   100% ELECTRICAL CAPABILITY    
Duane Arnold 94   100% ELECTRICAL CAPABILITY NO D/G OR SWITCHYARD WORK DUE TO SOLAR FLARE RESPONSE    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100     *  
Perry 1 100        
Point Beach 1 84   REDUCED POWER DUE TO GRID GEO-MAGNETIC DISTURBANCES *  
Point Beach 2 0 10/03/2003 EXITING REFUELING OUTAGE *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 99   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100     *  
Arkansas Nuclear 2 100     *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100     *  
Comanche Peak 2 28   HOLDING FOR FLUX MAPPING *  
Cooper 0 10/28/2003 ROD TESTING *  
Diablo Canyon 1 100   LIMITING UNPLANNED WORK ON TRIP MITIGATION EQUIPMENT *  
Diablo Canyon 2 100   LIMITING UNPLANNED WORK ON TRIP MITIGATION EQUIPMENT *  
Fort Calhoun 10   HOLDING IN PREPARATION TO START MAIN TURBINE *  
Grand Gulf 1 100        
Palo Verde 1 98   T-HOT LIMITED TAKING EXTRA READINGS ON PLANT COMPUTER DUE TO SOLAR FLARE RESPONSE    
Palo Verde 2 0 09/26/2003 DEFUELED    
Palo Verde 3 99   T-HOT LIMITED TAKING EXTRA READINGS ON PLANT COMPUTER DUE TO SOLAR FLARE RESPONSE    
River Bend 1 100     *  
San Onofre 2 100     *  
San Onofre 3 100     *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 10/19/2003 REFUELING OUTAGE    
Wolf Creek 1 0 10/18/2003 DEFUELED    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.