Power Reactor Status Report for October 30, 2003
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 80 | REDUCED POWER DUE TO SOLAR MAGNETIC DISTURBANCES | |||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 0 | 10/11/2003 | REFUELING OUTAGE | ||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | * | |||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 80 | REDUCED POWER DUE TO SOLAR MAGNETIC DISTURBANCES | |||
Salem 2 | 0 | 10/09/2003 | REFUELING OUTAGE | * | |
Seabrook 1 | 67 | INCREASING POWER | * | ||
Susquehanna 1 | 100 | ||||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 0 | 10/18/2003 | DEFUELED | * | |
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
Browns Ferry 2 | 0 | 10/28/2003 | MAINTENANCE OUTAGE | ||
Browns Ferry 3 | 100 | * | |||
Brunswick 1 | 93 | 100% ELECTRICAL CAPABILITY | |||
Brunswick 2 | 96 | 100% ELECTRICAL CAPABILITY | |||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 10/03/2003 | REFUELING OUTAGE | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | * | |||
Hatch 2 | 98 | POWER LIMITED BY CONTROL VALVE FUNCTION | * | ||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 0 | 09/19/2003 | DEFUELED | ||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 0 | 10/11/2003 | DEFUELED | ||
Surry 1 | 100 | ||||
Surry 2 | 0 | 09/18/2003 | REFUELING | ||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 0 | 10/05/2003 | REFUELING OUTAGE | ||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | REVIEWING SYSTEM PLANNING OPERATING GUIDE FOR SOLAR FLARE RESPONSE | * | ||
Braidwood 2 | 90 | COASTDOWN TO REFUELING OUTAGE REVIEWING SYSTEM PLANNING OPERATING GUIDE FOR SOLAR FLARE RESPONSE | * | ||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 47 | OFFGAS INLEAKAGE INVESTIGATION | * | ||
D.C. Cook 1 | 0 | 10/17/2003 | DEFUELED | * | |
D.C. Cook 2 | 100 | ||||
Davis-Besse | 0 | 02/15/2002 | MAINTENANCE OUTAGE | ||
Dresden 2 | 0 | 10/14/2003 | REFUELING OUTAGE | ||
Dresden 3 | 97 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 94 | 100% ELECTRICAL CAPABILITY NO D/G OR SWITCHYARD WORK DUE TO SOLAR FLARE RESPONSE | * | ||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | COMPENSATORY MONITORING OF RELAYS IN CONTROL ROOM FOR SOLAR FLARE RESPONSE | * | ||
Perry 1 | 100 | ||||
Point Beach 1 | 83 | INCREASING POWER FOLLOWING A DECREASE IN POWER DUE TO GRID GEO-MAGNETIC DISTURBANCES | * | ||
Point Beach 2 | 0 | 10/03/2003 | REFUELING OUTAGE | ||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 99 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | HOLDING OFF ON SWITCHYARD MAINTENANCE FOR SOLAR FLARE RESPONSE | * | ||
Arkansas Nuclear 2 | 100 | HOLDING OFF ON SWITCHYARD MAINTENANCE FOR SOLAR FLARE RESPONSE | * | ||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | CANCELLED D/G SURVEILLANCE DUE TO SOLAR FLARE RESPONSE | * | ||
Comanche Peak 2 | 28 | HOLDING FOR TURBINE TESTING | * | ||
Cooper | 0 | 10/28/2003 | SWITCHYARD REPAIR | * | |
Diablo Canyon 1 | 100 | LIMITING UNPLANNED WORK ON TRIP MIDIGATION EQUIPMENT | * | ||
Diablo Canyon 2 | 100 | LIMITING UNPLANNED WORK ON TRIP MIDIGATION EQUIPMENT | * | ||
Fort Calhoun | 1 | PERFORMING LOW POWER PHYSICS TEST @ <1% POWER | * | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 98 | T-HOT LIMITED TAKING EXTRA READINGS ON PLANT COMPUTER DUE TO SOLAR FLARE RESPONSE | * | ||
Palo Verde 2 | 0 | 09/26/2003 | DEFUELED | ||
Palo Verde 3 | 99 | T-HOT LIMITED TAKING EXTRA READINGS ON PLANT COMPUTER DUE TO SOLAR FLARE RESPONSE | * | ||
River Bend 1 | 100 | NO D/G OR RELAY TESTING DUE TO SOLAR FLARE RESPONSE | * | ||
San Onofre 2 | 100 | NEAREST FIRE IS 30 MILES AWAY IN SAN BERNADINO | * | ||
San Onofre 3 | 100 | NEAREST FIRE IS 30 MILES AWAY IN SAN BERNARDINO | * | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 0 | 10/19/2003 | REFUELING OUTAGE | ||
Wolf Creek 1 | 0 | 10/18/2003 | DEFUELED |