The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 19, 2003

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 90   Power Operation
REDUCED POWER FOR WATERBOX CLEANING
   
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 98   Power Operation
INCREASING POWER
*  
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100     *  
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 2   Startup
PERFORMING PLANT STARTUP
*  
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 Cold Shutdown
DEFUELED
   
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 94   Power Operation
100% ELECTRICAL CAPABILITY
   
BRUNSWICK 2 96   Power Operation
100% ELECTRICAL CAPABILITY
   
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 0 05/18/2003 Hot Standby
AUTOMATIC REACTOR TRIP. SEE EVENT #39856
*  
HATCH 1 100        
HATCH 2 50   Power Operation
INCREASING POWER AFTER "B" RECIRC PUMP TRIP
*  
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100     *  
OCONEE 2 100        
OCONEE 3 0 04/25/2003 Refueling
REFUELING OUTAGE - DEFUELED
   
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 0 04/20/2003 Refueling
REFUELING OUTAGE
   
SEQUOYAH 1 0 03/16/2003 Refueling
REFUELING OUTAGE - DEFUELED
   
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 0 04/19/2003 Refueling
REFUELING OUTAGE - DEFUELED
   
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 85   Power Operation
REDUCED POWER FOR MAINTENANCE
*  
BYRON 2 100     *  
CLINTON 1 81   Power Operation
PERFORMING ROD PATTERN ADJUSTMENT
*  
COOK 1 0 04/23/2003 Cold Shutdown
MAINTENANCE OUTAGE
   
COOK 2 0 04/23/2003 Refueling
DEFUELED
   
DAVIS BESSE 1 0 02/15/2002 Cold Shutdown
REFUELING OUTAGE
   
DRESDEN 2 98   Power Operation
100% ELECTRICAL CAPABILITY
*  
DRESDEN 3 98   Power Operation
100% ELECTRICAL CAPABILITY
   
DUANE ARNOLD 1 93   Power Operation
100% ELECTRICAL CAPABILITY
   
FERMI 2 97        
KEWAUNEE 1 100     *  
LASALLE 1 56   Power Operation
INCREASING POWER
*  
LASALLE 2 100        
MONTICELLO 1 0 04/26/2003 Cold Shutdown
REFUELING OUTAGE
   
PALISADES 1 100        
PERRY 1 0 04/04/2003 Refueling
REFUELING OUTAGE
   
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 97   Power Operation
100% ELECTRICAL CAPABILITY
*  
QUAD CITIES 2 97   Power Operation
100% ELECTRICAL CAPABILITY
   

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 0 05/03/2003 Refueling
REFUELING OUTAGE
   
COMANCHE PEAK 1 49   Power Operation
INCREASING POWER
*  
COMANCHE PEAK 2 0 05/15/2003 Hot Standby
MAINTENANCE OUTAGE
   
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 98   Power Operation
RCS T hot Temperature Limited
   
PALO VERDE 2 98   Power Operation
RCS T hot Temperature Limited
   
PALO VERDE 3 98   Power Operation
RCS T hot Temperature Limited
   
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 03/25/2003 Refueling
DEFUELED
   
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021