The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for February 6, 2003

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 98   Power Operation
COASTING DOWN FOR ROD PATTERN ADJUSTMENTS
*  
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 96   Power Operation
TROUBLESHOOTING INTERMEDIATE FEEDWATER HEATER PROBLEM
*  
PEACH BOTTOM 2 100     *  
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 94   Power Operation
COASTDOWN TO REFUELING OUTAGE
*  
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 Refueling
DEFUELED
   
BROWNS FERRY 2 76   Power Operation
COASTDOWN TO REFUELING OUTAGE
*  
BROWNS FERRY 3 100        
BRUNSWICK 1 94   Power Operation
100% ELECTRICAL POWER
   
BRUNSWICK 2 100        
CATAWBA 1 45   Power Operation
INCREASING POWER
*  
CATAWBA 2 100        
CRYSTAL RIVER 3 99     *  
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 83   Power Operation
COASTDOWN IN PROGRESS
   
NORTH ANNA 2 100     *  
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 99     *  
BYRON 2 100        
CLINTON 1 91   Power Operation
100% ELECTRICAL CAPABILITY
   
COOK 1 73   Power Operation
INCREASING POWER
*  
COOK 2 0 02/05/2003 Hot Standby
REACTOR TRIP ON LOW SG WATER LEVEL - SEE EN #39564
*  
DAVIS BESSE 1 0 02/15/2002 Refueling
REFUELING OUTAGE - DEFUELED
   
DRESDEN 2 95   Power Operation
100% ELECTRICAL CAPABILITY
*  
DRESDEN 3 97   Power Operation
100% ELECTRICAL CAPABILITY
   
DUANE ARNOLD 1 0 01/31/2003 Cold Shutdown
MAINTENANCE OUTAGE
   
FERMI 2 100        
KEWAUNEE 1 100        
LASALLE 1 100        
LASALLE 2 0 01/21/2003 Refueling
REFUELING OUTAGE
   
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 98   Power Operation
POWER UPRATE TESTING
   
POINT BEACH 2 98   Power Operation
POWER UPRATE TESTING
   
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 98   Power Operation
100% ELECTRICAL CAPABILITY
   
QUAD CITIES 2 98   Power Operation
100% ELECTRICAL CAPABILITY
   

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100     *  
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 0 02/03/2003 Cold Shutdown
REFUELING OUTAGE
*  
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 97   Power Operation
RCS T hot Temperature Limited
   
PALO VERDE 2 98   Power Operation
RCS T hot Temperature Limited
   
PALO VERDE 3 99   Power Operation
RCS T hot Temperature Limited
   
RIVER BEND 1 98   Power Operation
COASTDOWN TO REFUELING OUTAGE
*  
SAN ONOFRE 2 98   Power Operation
HOLDING POWER FOR FEEDWATER HEATER MAINTENANCE
   
SAN ONOFRE 3 0 01/06/2003 Refueling
REFUELING OUTAGE
   
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 0 01/24/2003 Cold Shutdown
MAINTENANCE OUTAGE
   
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021