Power Reactor Status Report for May 18, 2002
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 100 | ||||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 0 | 02/15/2002 | REFUELING OUTAGE - REFUELED | ||
CALVERT CLIFFS 2 | 100 | ||||
FITZPATRICK 1 | 100 | * | |||
GINNA 1 | 100 | ||||
HOPE CREEK 1 | 20 | TURBINE TRIP SOLENOID REPAIR | * | ||
INDIAN POINT 2 | 100 | ||||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 100 | ||||
MILLSTONE 2 | 100 | ||||
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 1 | HEATING UP - REACTOR AT <1% POWER | * | ||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 65 | HOTWELL MAINTENANCE | * | ||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 60 | PLANNED MAINTENANCE | * | ||
PILGRIM 1 | 100 | ||||
SALEM 1 | 100 | ||||
SALEM 2 | 44 | INCREASING POWER | * | ||
SEABROOK 1 | 0 | 05/04/2002 | REFUELING OUTAGE - REFUELED | ||
SUSQUEHANNA 1 | 98 | ||||
SUSQUEHANNA 2 | 100 | ||||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 0 | 05/11/2002 | MID-CYCLE MAINTENANCE OUTAGE TO REPLACE FAILED FUEL - REACTOR VESSEL HEAD REMOVED |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 100 | ||||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 100 | ||||
CATAWBA 1 | 18 | INCREASING POWER | * | ||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 23 | MAINTENANCE OUTAGE | * | ||
FARLEY 1 | 100 | ||||
FARLEY 2 | 100 | ||||
HARRIS 1 | 100 | ||||
HATCH 1 | 100 | ||||
HATCH 2 | 100 | ||||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 100 | ||||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 60 | WATERBOX REPAIR | * | ||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 0 | 04/14/2002 | REACTOR HEAT UP | ||
SUMMER 1 | 0 | 04/19/2002 | REFUELING OUTAGE - RELOADED | ||
SURRY 1 | 100 | ||||
SURRY 2 | 100 | ||||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 20 | CRDM COOLING FAN REPAIR | * | ||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 100 | ||||
BYRON 1 | 100 | ||||
BYRON 2 | 100 | MEASURED STEAM GENERATOR TUBE LEAKAGE = 28 GPD | * | ||
CLINTON 1 | 76 | INCREASING POWER | * | ||
COOK 1 | 0 | 05/04/2002 | REFUELING OUTAGE - DEFUELED | ||
COOK 2 | 100 | * | |||
DAVIS BESSE 1 | 0 | 02/15/2002 | REFUELING OUTAGE - FUEL SHUFFLE COMPLETE | ||
DRESDEN 2 | 96 | 100% ELECTRICAL CAPABILITY | * | ||
DRESDEN 3 | 100 | ||||
DUANE ARNOLD 1 | 93 | 100% ELECTRICAL CAPABILITY | |||
FERMI 2 | 82 | INCREASING POWER | * | ||
KEWAUNEE 1 | 100 | * | |||
LASALLE 1 | 0 | 05/18/2002 | PLANNED MAINTENANCE OUTAGE | * | |
LASALLE 2 | 100 | ||||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 86 | TURBINE VALVE TEST | * | ||
PERRY 1 | 100 | ||||
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 100 | ||||
QUAD CITIES 2 | 96 | 100% ELECTRICAL POWER |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 100 | ||||
COLUMBIA GENERATING | 100 | ||||
COMANCHE PEAK 1 | 91 | INCREASING POWER | * | ||
COMANCHE PEAK 2 | 100 | ||||
COOPER 1 | 0 | 05/14/2002 | SHUT DOWN FOR EHC MAINTENANCE | ||
DIABLO CANYON 1 | 0 | 04/28/2002 | REFUELING OUTAGE - REFUELED | ||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 0 | 05/03/2002 | REFUELING OUTAGE - DEFUELED | ||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 99 | ||||
PALO VERDE 2 | 97 | ||||
PALO VERDE 3 | 99 | ||||
RIVER BEND 1 | 70 | INCREASING POWER | * | ||
SAN ONOFRE 2 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
SAN ONOFRE 3 | 100 | ||||
SOUTH TEXAS 1 | 100 | ||||
SOUTH TEXAS 2 | 91 | GOVERNOR VALVE MAINTENANCE | * | ||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 0 | 05/13/2002 | MAINTENANCE OUTAGE |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021