The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for February 3, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 63   DECREASING POWER TO 50% TO PERFORM A 24-HOUR HOLD AND TURBINE VALVE TESTING BEFORE ENTERING A REFUELING OUTAGE *  
CALVERT CLIFFS 1 96   COASTDOWN TO REFUELING OUTAGE *  
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 96   COASTDOWN TO REFUELING OUTAGE    
LIMERICK 2 100        
MILLSTONE 2 87   COASTDOWN TO REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100     *  
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 89   COASTDOWN TO REFUELING OUTAGE    
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 85   HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING *  
BRUNSWICK 1 100   FINAL FEEDWATER REDUCTION - COASTDOWN TO REFUELING OUTAGE *  
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 52   HOLDING POWER AT THIS LEVEL TO REPAIR THE 1B CONDENSATE BOOSTER PUMP *  
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100     *  
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 95   100% ELECTRICAL CAPABILITY    
BYRON 1 98   100% ELECTRICAL CAPABILITY    
BYRON 2 99   100% ELECTRICAL CAPABILITY    
CLINTON 1 100        
COOK 1 100        
COOK 2 0 01/19/2002 REFUELING OUTAGE - DEFUELED    
DAVIS BESSE 1 100        
DRESDEN 2 95   100% ELECTRICAL CAPABILITY    
DRESDEN 3 100        
DUANE ARNOLD 1 93   HOLDING POWER AT THIS LEVEL DUE TO A FEEDWATER REGULATING VALVE ISSUE    
FERMI 2 100        
KEWAUNEE 1 100        
LASALLE 1 0 01/10/2002 REFUELING OUTAGE - STARTUP IN PROGRESS *  
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 50   HOLDING POWER AT THIS LEVEL TO CLEAN WATERBOXES    
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 0 02/01/2002 REFUELING OUTAGE *  
QUAD CITIES 1 0 01/09/2002 MAINTENANCE OUTAGE    
QUAD CITIES 2 95   COASTDOWN TO REFUELING OUTAGE    

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 96   HOLDING POWER AT THIS LEVEL TO PERFORM HEATER DRAIN PUMP MODIFICATIONS    
CALLAWAY 1 0 01/31/2002 MAINTENANCE OUTAGE    
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 98        
GRAND GULF 1 100        
PALO VERDE 1 99        
PALO VERDE 2 98        
PALO VERDE 3 99        
RIVER BEND 1 95   INCREASING POWER AFTER PERFORMING A ROD SHUFFLE WHILE AT 72% POWER *  
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021