Power Reactor Status Report for July 11, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100     *  
GINNA 1 100        
HOPE CREEK 1 98     *  
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100     *  
MILLSTONE 3 91   REDUCED POWER DUE TO THERMAL BACK WASH OF THE CONDENSER *  
NINE MILE POINT 1 100   RECIRC PUMP IS BEING RESTARTED *  
NINE MILE POINT 2 0 07/02/1999 SHUTDOWN FOR REPAIRS TO THE RCIC SYSTEM    
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 91   INCREASING POWER *  
PILGRIM 1 90   HOLDING FOR FEEDWATER HEATER CONTROL PROBLEM *  
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 0 07/01/1999 SHUTDOWN FOR REPAIR OF OUTBOARD MSIV    
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100     *  
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 95   MAXIMUM OPERATING POWER    
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 8   HOLDING TO BALANCE TURBINE    
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 75   REDUCED POWER FOR WATERBOX CLEANING *  
SURRY 2 0 07/05/1999 MAINTENANCE OUTAGE    
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100        
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 87   LOAD FOLLOWING *  
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 97        
KEWAUNEE 1 97        
LASALLE 1 55   REDUCED POWER DUE TO CONDENSER CLEANING    
LASALLE 2 100        
MONTICELLO 1 75   REDUCED POWER DUE TO MSIV TEST *  
PALISADES 1 100        
PERRY 1 67   REDUCED POWER DUE TO ROD SEQUENCE EXCHANGE *  
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100     *  
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 60   REDUCED POWER DUE TO MAIN TURBINE STEAM LEAK *  
SAN ONOFRE 2 100        
SAN ONOFRE 3 94   REDUCED POWER DUE TO HEATER DRAIN PUMP PROBLEMS *  
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 87   REDUCED POWER DUE FEEDWATER HEATER TUBE LEAK    
WASHINGTON NUCLEAR 2 62   HOLDING POWER    
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021