The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for July 11, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100     *  
GINNA 1 100        
HOPE CREEK 1 98     *  
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100     *  
MILLSTONE 3 91   REDUCED POWER DUE TO THERMAL BACK WASH OF THE CONDENSER *  
NINE MILE POINT 1 100   RECIRC PUMP IS BEING RESTARTED *  
NINE MILE POINT 2 0 07/02/1999 SHUTDOWN FOR REPAIRS TO THE RCIC SYSTEM    
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 91   INCREASING POWER *  
PILGRIM 1 90   HOLDING FOR FEEDWATER HEATER CONTROL PROBLEM *  
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 0 07/01/1999 SHUTDOWN FOR REPAIR OF OUTBOARD MSIV    
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100     *  
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 95   MAXIMUM OPERATING POWER    
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 8   HOLDING TO BALANCE TURBINE    
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 75   REDUCED POWER FOR WATERBOX CLEANING *  
SURRY 2 0 07/05/1999 MAINTENANCE OUTAGE    
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100        
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 87   LOAD FOLLOWING *  
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 97        
KEWAUNEE 1 97        
LASALLE 1 55   REDUCED POWER DUE TO CONDENSER CLEANING    
LASALLE 2 100        
MONTICELLO 1 75   REDUCED POWER DUE TO MSIV TEST *  
PALISADES 1 100        
PERRY 1 67   REDUCED POWER DUE TO ROD SEQUENCE EXCHANGE *  
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100     *  
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 60   REDUCED POWER DUE TO MAIN TURBINE STEAM LEAK *  
SAN ONOFRE 2 100        
SAN ONOFRE 3 94   REDUCED POWER DUE TO HEATER DRAIN PUMP PROBLEMS *  
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 87   REDUCED POWER DUE FEEDWATER HEATER TUBE LEAK    
WASHINGTON NUCLEAR 2 62   HOLDING POWER    
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021