Power Reactor Status Report for May 6, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 0 | 05/01/1999 | SURVEILLANCE OUTAGE - SHUTDOWN DUE TO PROBLEMS WITH THE MAIN TURBINE SEAL OI | ||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 0 | 03/12/1999 | EXITING REFUELING OUTAGE | ||
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 100 | REACTOR POWER DECREASED FROM 97% TO 94% ON 05/05/99 DUE TO A 1.2-SECOND TURB | * | ||
HOPE CREEK 1 | 100 | ||||
INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES F | |||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE - FUEL SHUFFLE ON HOLD - PERFORMING CONTROL ROD DRIVE MAINT | * | |
MILLSTONE 2 | 0 | 02/20/1996 | EXITING REFUELING OUTAGE - PLANT STARTUP ON HOLD DUE TO RESTRAINING ORDER BY | ||
MILLSTONE 3 | 0 | 05/01/1999 | ENTERING REFUELING OUTAGE | ||
NINE MILE POINT 1 | 0 | 04/11/1999 | REFUELING OUTAGE - DEFUELED | ||
NINE MILE POINT 2 | 32 | HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT RECIRCULATION FLOW CONTROL VALVE | * | ||
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 80 | HOLDING POWER AT THIS LEVEL DUE TO AN INOPERABLE MAIN STEAM ISOLATION VALVE | |||
SALEM 1 | 100 | ||||
SALEM 2 | 0 | 04/03/1999 | REFUELING OUTAGE - VESSEL HEAD TENSIONING IN PROGRESS | * | |
SEABROOK 1 | 0 | 03/27/1999 | REFUELING OUTAGE - BUBBLE DRAWN IN PRESSURIZER | * | |
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 95 | HOLDING POWER AT THIS LEVEL IN PREPARATION FOR A PLANNED FORCED MAINTENANCE | * | ||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 0 | 04/11/1999 | EXITING REFUELING OUTAGE - NEAR POINT OF CRITICALITY | * | |
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE - FUEL RELOAD IN PROGRESS | ||
CATAWBA 1 | 0 | 04/21/1999 | REFUELING OUTAGE - DEFUELED | ||
CATAWBA 2 | 0 | 05/03/1999 | TS REQUIRED SHUTDOWN FROM 9% POWER ON 05/05/99 DUE TO BIOLOGICAL FOULING IN | * | |
CRYSTAL RIVER 3 | 85 | HOLDING POWER AT THIS LEVEL TO PERFORM CIRCULATING PUMP MAINTENANCE | |||
FARLEY 1 | 100 | ||||
FARLEY 2 | 49 | OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD | * | ||
HARRIS 1 | 100 | ||||
HATCH 1 | 53 | HOLDING POWER AT THIS LEVEL TO REPAIR A CIRCULATING WATER PUMP | * | ||
HATCH 2 | 0 | 05/05/1999 | AUTOMATIC REACTOR SCRAM FROM 98% MAXIMUM OPERATING POWER DUE TO A GENERATOR | * | 1 |
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 100 | ||||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 0 | 04/18/1999 | EXITING REFUELING OUTAGE | ||
SUMMER 1 | 0 | 04/03/1999 | EXITING REFUELING OUTAGE | ||
SURRY 1 | 100 | ||||
SURRY 2 | 0 | 04/18/1999 | REFUELING OUTAGE - DEFUELED | ||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 100 | ||||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 0 | 04/23/1999 | REFUELING OUTAGE - FUEL RELOAD COMPLETE | * | |
BYRON 1 | 100 | ||||
BYRON 2 | 100 | ||||
CLINTON 1 | 0 | 09/06/1996 | EXITING REFUELING OUTAGE - ROD WITHDRAWAL IN PROGRESS | * | |
COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
DAVIS BESSE 1 | 0 | 04/23/1999 | MAINTENANCE OUTAGE | ||
DRESDEN 2 | 100 | ||||
DRESDEN 3 | 100 | ||||
DUANE ARNOLD 1 | 100 | ||||
FERMI 2 | 97 | ADMINISTRATIVE POWER LIMIT | |||
KEWAUNEE 1 | 97 | POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING | |||
LASALLE 1 | 100 | ||||
LASALLE 2 | 100 | ||||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 100 | ||||
PERRY 1 | 80 | INCREASING POWER AFTER EXITING A REFUELING OUTAGE | * | ||
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 0 | 04/16/1999 | REFUELING OUTAGE - FUEL RELOAD COMPLETE | * | |
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 85 | DECREASING POWER TO APPROXIMATELY 60% TO PERFORM A CONTROL ROD SHUFFLE | * | ||
QUAD CITIES 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 100 | ||||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 100 | ||||
PALO VERDE 2 | 98 | HOLDING POWER AT THIS LEVEL TO PERFORM STEAM GENERATOR HIGH RATE BLOWDOWNS A | * | ||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 0 | 04/03/1999 | REFUELING OUTAGE - FUEL PARTIALLY OFFLOADED - FUEL INSPECTIONS IN PROGRESS | ||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 0 | 03/27/1999 | EXITING REFUELING OUTAGE | * | |
SOUTH TEXAS 1 | 100 | ||||
SOUTH TEXAS 2 | 100 | ||||
WASHINGTON NUCLEAR 2 | 0 | 04/17/1999 | MAINTENANCE OUTAGE | ||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 0 | 04/03/1999 | EXITING REFUELING OUTAGE - PREPARING TO ENTER MODE 3 (HOT STANDBY) |