Power Reactor Status Report for May 6, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 0 | 05/01/1999 | SURVEILLANCE OUTAGE - SHUTDOWN DUE TO PROBLEMS WITH THE MAIN TURBINE SEAL OI | ||
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 100 | ||||
| CALVERT CLIFFS 2 | 0 | 03/12/1999 | EXITING REFUELING OUTAGE | ||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 100 | REACTOR POWER DECREASED FROM 97% TO 94% ON 05/05/99 DUE TO A 1.2-SECOND TURB | * | ||
| HOPE CREEK 1 | 100 | ||||
| INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES F | |||
| INDIAN POINT 3 | 100 | ||||
| LIMERICK 1 | 100 | ||||
| LIMERICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE - FUEL SHUFFLE ON HOLD - PERFORMING CONTROL ROD DRIVE MAINT | * | |
| MILLSTONE 2 | 0 | 02/20/1996 | EXITING REFUELING OUTAGE - PLANT STARTUP ON HOLD DUE TO RESTRAINING ORDER BY | ||
| MILLSTONE 3 | 0 | 05/01/1999 | ENTERING REFUELING OUTAGE | ||
| NINE MILE POINT 1 | 0 | 04/11/1999 | REFUELING OUTAGE - DEFUELED | ||
| NINE MILE POINT 2 | 32 | HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT RECIRCULATION FLOW CONTROL VALVE | * | ||
| OYSTER CREEK 1 | 100 | ||||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 80 | HOLDING POWER AT THIS LEVEL DUE TO AN INOPERABLE MAIN STEAM ISOLATION VALVE | |||
| SALEM 1 | 100 | ||||
| SALEM 2 | 0 | 04/03/1999 | REFUELING OUTAGE - VESSEL HEAD TENSIONING IN PROGRESS | * | |
| SEABROOK 1 | 0 | 03/27/1999 | REFUELING OUTAGE - BUBBLE DRAWN IN PRESSURIZER | * | |
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 95 | HOLDING POWER AT THIS LEVEL IN PREPARATION FOR A PLANNED FORCED MAINTENANCE | * | ||
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
| BROWNS FERRY 2 | 0 | 04/11/1999 | EXITING REFUELING OUTAGE - NEAR POINT OF CRITICALITY | * | |
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 100 | ||||
| BRUNSWICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE - FUEL RELOAD IN PROGRESS | ||
| CATAWBA 1 | 0 | 04/21/1999 | REFUELING OUTAGE - DEFUELED | ||
| CATAWBA 2 | 0 | 05/03/1999 | TS REQUIRED SHUTDOWN FROM 9% POWER ON 05/05/99 DUE TO BIOLOGICAL FOULING IN | * | |
| CRYSTAL RIVER 3 | 85 | HOLDING POWER AT THIS LEVEL TO PERFORM CIRCULATING PUMP MAINTENANCE | |||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 49 | OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD | * | ||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 53 | HOLDING POWER AT THIS LEVEL TO REPAIR A CIRCULATING WATER PUMP | * | ||
| HATCH 2 | 0 | 05/05/1999 | AUTOMATIC REACTOR SCRAM FROM 98% MAXIMUM OPERATING POWER DUE TO A GENERATOR | * | 1 |
| MCGUIRE 1 | 100 | ||||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 100 | ||||
| NORTH ANNA 2 | 100 | ||||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 100 | ||||
| ROBINSON 2 | 100 | ||||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 100 | ||||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 0 | 04/18/1999 | EXITING REFUELING OUTAGE | ||
| SUMMER 1 | 0 | 04/03/1999 | EXITING REFUELING OUTAGE | ||
| SURRY 1 | 100 | ||||
| SURRY 2 | 0 | 04/18/1999 | REFUELING OUTAGE - DEFUELED | ||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 100 | ||||
| BRAIDWOOD 2 | 0 | 04/23/1999 | REFUELING OUTAGE - FUEL RELOAD COMPLETE | * | |
| BYRON 1 | 100 | ||||
| BYRON 2 | 100 | ||||
| CLINTON 1 | 0 | 09/06/1996 | EXITING REFUELING OUTAGE - ROD WITHDRAWAL IN PROGRESS | * | |
| COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
| COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
| DAVIS BESSE 1 | 0 | 04/23/1999 | MAINTENANCE OUTAGE | ||
| DRESDEN 2 | 100 | ||||
| DRESDEN 3 | 100 | ||||
| DUANE ARNOLD 1 | 100 | ||||
| FERMI 2 | 97 | ADMINISTRATIVE POWER LIMIT | |||
| KEWAUNEE 1 | 97 | POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING | |||
| LASALLE 1 | 100 | ||||
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 100 | ||||
| PALISADES 1 | 100 | ||||
| PERRY 1 | 80 | INCREASING POWER AFTER EXITING A REFUELING OUTAGE | * | ||
| POINT BEACH 1 | 100 | ||||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 0 | 04/16/1999 | REFUELING OUTAGE - FUEL RELOAD COMPLETE | * | |
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 85 | DECREASING POWER TO APPROXIMATELY 60% TO PERFORM A CONTROL ROD SHUFFLE | * | ||
| QUAD CITIES 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 100 | ||||
| COMANCHE PEAK 1 | 100 | ||||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 100 | ||||
| DIABLO CANYON 1 | 100 | ||||
| DIABLO CANYON 2 | 100 | ||||
| FT CALHOUN 1 | 100 | ||||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 100 | ||||
| PALO VERDE 2 | 98 | HOLDING POWER AT THIS LEVEL TO PERFORM STEAM GENERATOR HIGH RATE BLOWDOWNS A | * | ||
| PALO VERDE 3 | 100 | ||||
| RIVER BEND 1 | 0 | 04/03/1999 | REFUELING OUTAGE - FUEL PARTIALLY OFFLOADED - FUEL INSPECTIONS IN PROGRESS | ||
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 0 | 03/27/1999 | EXITING REFUELING OUTAGE | * | |
| SOUTH TEXAS 1 | 100 | ||||
| SOUTH TEXAS 2 | 100 | ||||
| WASHINGTON NUCLEAR 2 | 0 | 04/17/1999 | MAINTENANCE OUTAGE | ||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 0 | 04/03/1999 | EXITING REFUELING OUTAGE - PREPARING TO ENTER MODE 3 (HOT STANDBY) |
Page Last Reviewed/Updated Thursday, March 25, 2021