Power Reactor Status Report for April 11, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 99 | POWER LIMITED DUE TO AN OUT OF SERVICE MOISTURE SEPARATOR REHEATER | |||
BEAVER VALLEY 2 | 1 | LOW POWER PHYSICS TESTING | * | ||
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 0 | 03/12/1999 | REFUELING OUTAGE - DEFUELED | ||
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 0 | 03/01/1999 | REFUELING OUTAGE - | ||
HOPE CREEK 1 | 100 | ||||
INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION | |||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 82 | COASTDOWN TO REFUELING OUTAGE | |||
MILLSTONE 2 | 0 | 02/20/1996 | REFUELING OUTAGE - REPAIRING A SMALL (400 ml/min) BODY-TO-BONNET LEAK IN A S | ||
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 100 | ||||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 80 | HOLDING POWER AT THIS LEVEL DUE TO AN INOPERABLE MAIN STEAM ISOLATION VALVE | |||
SALEM 1 | 100 | ||||
SALEM 2 | 0 | 04/03/1999 | REFUELING OUTAGE | * | |
SEABROOK 1 | 0 | 03/27/1999 | REFUELING OUTAGE - DEFUELED | ||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 0 | 03/12/1999 | REFUELING OUTAGE - | ||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 81 | COASTDOWN TO REFUELING OUTAGE | |||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | * | |||
BRUNSWICK 2 | 95 | COASTDOWN TO REFUELING OUTAGE | |||
CATAWBA 1 | 100 | ||||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 100 | ||||
FARLEY 2 | 50 | OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD | |||
HARRIS 1 | 100 | ||||
HATCH 1 | 0 | 03/01/1999 | REFUELING OUTAGE - | ||
HATCH 2 | 98 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION AFTER PERFORMA | |||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 0 | 03/12/1999 | REFUELING OUTAGE - | ||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 65 | SECONDARY MAINTENANCE ACTIVITIES | * | ||
SAINT LUCIE 1 | 98 | * | |||
SAINT LUCIE 2 | 95 | * | |||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 66 | COASTDOWN TO REFUELING OUTAGE | |||
SUMMER 1 | 0 | 04/03/1999 | REFUELING OUTAGE - | ||
SURRY 1 | 100 | ||||
SURRY 2 | 70 | COASTDOWN TO REFUELING OUTAGE | |||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 100 | * | |||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 0 | 02/27/1999 | REFUELING OUTAGE |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 88 | COASTDOWN TO REFUELING OUTAGE | * | ||
BYRON 1 | 0 | 03/27/1999 | REFUELING OUTAGE - RELOADING CORE | * | |
BYRON 2 | 100 | ||||
CLINTON 1 | 0 | 09/06/1996 | REFUELING OUTAGE | ||
COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 86 | EQUIPMENT SWAPS | * | ||
DRESDEN 3 | 100 | * | |||
DUANE ARNOLD 1 | 100 | ||||
FERMI 2 | 52 | PLANNED MAINTENANCE | * | ||
KEWAUNEE 1 | 60 | TURBINE VALVE TESTING AND INSPECTING MFP BEARINGS | * | ||
LASALLE 1 | 99 | ||||
LASALLE 2 | 15 | READY TO STARTUP MAIN TURBINE | * | ||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 100 | ||||
PERRY 1 | 0 | 03/26/1999 | REFUELING OUTAGE - | ||
POINT BEACH 1 | 100 | * | |||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 0 | 04/09/1999 | MAINTENANCE OUTAGE | ||
QUAD CITIES 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 100 | ||||
COMANCHE PEAK 1 | 100 | * | |||
COMANCHE PEAK 2 | 0 | 03/20/1999 | REFUELING OUTAGE - CORE RELOADED | * | |
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 100 | ||||
PALO VERDE 2 | 0 | 03/26/1999 | REFUELING OUTAGE - DEFUELED | ||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 0 | 04/03/1999 | REFUELING OUTAGE - | ||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 0 | 03/27/1999 | REFUELING OUTAGE - DEFUELED | ||
SOUTH TEXAS 1 | 0 | 03/26/1999 | REFUELING OUTAGE - DEFUELED | ||
SOUTH TEXAS 2 | 100 | ||||
WASHINGTON NUCLEAR 2 | 85 | LOAD FOLLOW | * | ||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 0 | 04/03/1999 | REFUELING OUTAGE - |