Power Reactor Status Report for April 5, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 98 | POWER LIMITED DUE TO AN OUT OF SERVICE MOISTURE SEPARATOR REHEATER | |||
BEAVER VALLEY 2 | 0 | 02/26/1999 | EXITING REFUELING OUTAGE | * | |
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 0 | 03/12/1999 | REFUELING OUTAGE - DEFUELED | ||
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 0 | 03/01/1999 | REFUELING OUTAGE - FUEL RELOAD IN PROGRESS | ||
HOPE CREEK 1 | 77 | HOLDING POWER AT THIS LEVEL TO CALIBRATE MOISTURE SEPARATOR REHEATER LEVEL | * | ||
INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION | |||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 84 | COASTDOWN TO REFUELING OUTAGE | * | ||
MILLSTONE 2 | 0 | 02/20/1996 | REFUELING OUTAGE - UNIT AT NORMAL OPERATING TEMPERATURE AND PRESSURE - MODE | * | |
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 100 | ||||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 83 | HOLDING POWER AT THIS LEVEL DUE TO AN INOPERABLE MAIN STEAM ISOLATION VALVE | * | ||
SALEM 1 | 100 | ||||
SALEM 2 | 0 | 04/03/1999 | ENTERING REFUELING OUTAGE | * | |
SEABROOK 1 | 0 | 03/27/1999 | REFUELING OUTAGE | * | |
SUSQUEHANNA 1 | 100 | * | |||
SUSQUEHANNA 2 | 0 | 03/12/1999 | REFUELING OUTAGE - FUEL PARTIALLY OFFLOADED - FUEL SHUFFLE SUSPENDED DUE TO | * | |
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 80 | HOLDING POWER AT THIS LEVEL TO PERFORM FEEDWATER SYSTEM MAINTENANCE ACTIVITI | * | ||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 95 | COASTDOWN TO REFUELING OUTAGE | * | ||
CATAWBA 1 | 100 | ||||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 100 | * | |||
FARLEY 1 | 100 | ||||
FARLEY 2 | 50 | OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD | |||
HARRIS 1 | 100 | ||||
HATCH 1 | 0 | 03/01/1999 | REFUELING OUTAGE - FUEL SHUFFLE COMPLETE | ||
HATCH 2 | 98 | MAXIMUM OPERATING POWER | |||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 0 | 03/12/1999 | REFUELING OUTAGE - FUEL RELOAD COMPLETE | ||
NORTH ANNA 1 | 98 | HOLDING POWER AT THIS LEVEL DUE TO HIGH TEMPERATURE ON A MAIN GENERATOR BUS | * | ||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 70 | COASTDOWN TO REFUELING OUTAGE | * | ||
SUMMER 1 | 0 | 04/03/1999 | ENTERING REFUELING OUTAGE | ||
SURRY 1 | 100 | ||||
SURRY 2 | 74 | COASTDOWN TO REFUELING OUTAGE | |||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 0 | 03/15/1999 | EXITING REFUELING OUTAGE | * | |
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 0 | 02/27/1999 | REFUELING OUTAGE |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 90 | DECREASING POWER DUE TO RUPTURE OF A HEATER DRAIN TANK RUPTURE DISC IN A LIN | * | ||
BRAIDWOOD 2 | 92 | COASTDOWN TO REFUELING OUTAGE | * | ||
BYRON 1 | 0 | 03/27/1999 | REFUELING OUTAGE - DEFUELED | * | |
BYRON 2 | 74 | HOLDING POWER AT THIS LEVEL TO REPAIR A LOW PRESSURE HEATER LEAK (ONE STRING | * | ||
CLINTON 1 | 0 | 09/06/1996 | REFUELING OUTAGE | ||
COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 99 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION | * | ||
DRESDEN 3 | 99 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION | * | ||
DUANE ARNOLD 1 | 100 | ||||
FERMI 2 | 97 | POWER LIMITED DUE TO POWER UPRATE ISSUES | |||
KEWAUNEE 1 | 98 | POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING | |||
LASALLE 1 | 65 | PREPARING TO INCREASE POWER AFTER PERFORMING POWER SUPPRESSION TESTING TO ID | * | ||
LASALLE 2 | 0 | 09/20/1996 | REFUELING OUTAGE | ||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 100 | ||||
PERRY 1 | 0 | 03/26/1999 | REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | ||
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 99 | MAXIMUM OPERATING POWER DUE TO JET PUMP RISER BRACE LIMITATIONS | |||
QUAD CITIES 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 0 | 03/20/1999 | REFUELING OUTAGE - DEFUELED | ||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 100 | ||||
PALO VERDE 2 | 0 | 03/26/1999 | REFUELING OUTAGE - DEFUELED | ||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 0 | 04/03/1999 | ENTERING REFUELING OUTAGE - PLAN TO ENTER CONDITION 5 (REFUELING) TODAY | * | |
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 0 | 03/27/1999 | REFUELING OUTAGE - PLAN TO COMMENCE FUEL OFFLOAD TODAY | * | |
SOUTH TEXAS 1 | 0 | 03/26/1999 | REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | ||
SOUTH TEXAS 2 | 100 | ||||
WASHINGTON NUCLEAR 2 | 78 | INCREASING POWER FROM 65% TO 85% AS PART OF LOAD FOLLOWING ACTIVITIES | * | ||
WATERFORD 3 | 67 | SLOWLY INCREASING POWER AFTER EXITING A REFUELING OUTAGE | * | ||
WOLF CREEK 1 | 0 | 04/03/1999 | ENTERING REFUELING OUTAGE |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021