The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Part 21 Report - 1999-220

 

 

LICENSEE: COLTEC INDUSTRIES
SITE: ROCHESTER GAS AND ELECTRIC COR EN NUMBER:35567
DOCKET: EVENT DATE: 04-09-99
RX TYPE: EVENT TIME:
VENDORS: NOTIFY DATE: 04-09-99
EMERGENCY CLASS: N/A REGION: 1 STATE: NY TIME: 13:50
OPS OFFICER: CHAUNCEY GOULD  
10 CFR SECTION: CCCC UNSPECIFIED PARAGRAPH  

THE LICENSEE REPORTED A PART 21 DEFECT ON A REPLACEMENT TURBOCHARGER SUPPLIED BY COLTEC INDUSTRIES.

THE LICENSEE REPLACED A TURBOCHARGER(MODEL 730), SUPPLIED BY COLTEC INDUSTRIES, ON THEIR "B" EMERGENCY DIESEL GENERATOR (ALCO MODEL 16-251F) AT GINNA STATION. IT WAS DETERMINED THAT THERE WAS A MANUFACTURING DEFICIENCY IN THE REPLACEMENT TURBOCHARGER WHICH CONSISTED OF A MISSING DRAIN PORT IN THE INTERMEDIATE CASING ON THE TURBINE END WHICH WOULD PREVENT ENGINE LUBRICATING OIL FROM BEING ABLE TO DRAIN BACK TO THE ENGINE SUMP FROM THE TURBOCHARGER SHAFT AND BEARINGS. THIS DEFICIENCY CREATED A CONDITION WHERE ENGINE LUBE OIL WAS BEING DIRECTED INTO THE CYLINDERS THROUGH THE EXHAUST MANIFOLD PIPING, WHICH COULD HAVE RESULTED IN SERIOUS ENGINE DAMAGE.

Page Last Reviewed/Updated Thursday, March 25, 2021