Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Part 21 Report - 1997-405

ACCESSION #: 9707150333 Interim Report (97-004) Subject: Interim report of evaluation of a deviation pursuant to 10 CFR 21.21(a)(2) Title: Critical Power Methodology for ATRIUM-10 Identification of Basic Activity: BWR ANFB Dryout Correlation for ATRIUM-10 Fuel Design Basic Activity Supplied By: Siemens Power Corporation - Nuclear Division Nature of Deviation: This is in response to the NRC identified nonconformance associated with development of the dryout correlation used for the ATRIUM-10 fuel design observed during NRC Inspection 99900081/97-01. Additional testing and correlation development is required. Discovery Date: May 13, 1997 Corrective Actions to Date: Nonconformance report (NCR-6113) was prepared and processed by management review team as required by SPC-ND's Quality Assurance Manual, EMF-1. To date, additional dryout testing is proceeding on schedule. The NRC was apprised of the status on July 8, 1997. Evaluation Completion Schedule Date: Submittal of a revised correlation is expected by November 1, 1997 *** END OF DOCUMENT ***

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021