Part 21 Report - 1996-740
LICENSEE: PUBLIC SERVICE ELECTRIC & GAS CO.
SITE: SALEM 2 EN NUMBER:30850
DOCKET: 05000311 EVENT DATE: 08-07-96
RX TYPE: PWR EVENT TIME: 16:00
VENDORS: W-4-LP NOTIFY DATE: 08-08-96
EMERGENCY CLASS: N/A REGION: 1 STATE: NJ TIME: 16:17
OPS OFFICER: JOHN MacKINNON
10 CFR SECTION: CDEG 21.21(c)(3)(i) DEFECTS/NONCOMPLIANCE
UNIT SCRAM RX INIT INITIAL MODE CURR CURRENT MODE
CODE CRIT PWR PWR
2 N N 0 REFUELING 0 REFUELING
TEN OF 222 REPLACEMENT SUMMATOR AND ISOLATOR MODULES FOR SALEM
UNIT 2 (USED IN THE REACTOR CONTROL AND PROTECTION SYSTEMS) WERE
FOUND TO HAVE UNSOLDERED ELECTRICAL CONNECTIONS DURING
INSPECTION.
NUS MODEL OCA801 SIGNAL ISOLATOR MODULES AND MODEL MTH801 SIGNAL
SUMMATOR MODULES ARE BEING INSTALLED AS REPLACEMENT FOR MODULES
IN THE REACTOR CONTROL AND PROTECTION SYSTEM TO PROVIDE IMPROVED
RELIABILITY. DURING BENCH TESTING, AN ELECTRICAL CONNECTION WITH
NO SOLDER WAS OBSERVED ON A REPLACEMENT SUMMATOR MODULE. ALL
REPLACEMENT SUMMATOR AND ISOLATOR MODULES FOR SALEM UNIT 2 WERE
THEN INSPECTED. TEN OF 222 MODULES WERE FOUND TO HAVE UNSOLDERED
ELECTRICAL CONNECTIONS. ANOTHER SEVEN MODULES WERE FOUND TO HAVE
INSUFFICIENT SOLDER ON AT LEAST ONE CONNECTION. SOME OF THE
DEFECTIVE CONNECTIONS WERE COVERED BY HEAT SHRINK INSULATION.
THE MODULES WERE MANUFACTURED BY NUS, P.O BOX 50736, IDAHO FALLS,
ID., 83405. ALL REPLACEMENT MODULES FOR SALEM UNIT 2 HAVE BEEN
INSPECTED BY THE VENDOR AND REPAIRED. ALL REPLACEMENT MODULES FOR
SALEM UNIT 1 HAVE BEEN RETURNED TO THE VENDOR FOR INSPECTION AND
REPAIR. PSE&G IS INVESTIGATING THE CAUSE OF THE DEFECT WITH THE
VENDOR. RESULTS WILL BE PROVIDED WHEN THE INVESTIGATION IS
COMPLETED.
THE NRC RESIDENT INSPECTOR WAS INFORMED OF THIS PART 21 BY THE
LICENSEE.
PART 21 SENT TO VERN HODGE VIA FACSIMILE.
Page Last Reviewed/Updated Wednesday, March 24, 2021