Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Part 21 Report - 1996-292

LICENSEE: MKW POWER SYSTEMS, INC. SITE: MKW POWER SYSTEMS, INC. EN NUMBER:30475 DOCKET: EVENT DATE: 05-16-96 RX TYPE: EVENT TIME: 00:00 VENDORS: NOTIFY DATE: 05-16-96 EMERGENCY CLASS: N/A REGION: 2 STATE: NC TIME: 13:41 OPS OFFICER: CHAUNCEY GOULD 10 CFR SECTION: CCCC 21.21 UNSPECIFIED PARAGRAPH MKW POWER SYSTEMS, INC., REPORTED THAT THERE IS A PROBLEM WITH A VOLTAGE REGULATOR USED ON THEIR SAFETY RELATED DIESEL GENERATORS. DURING REPAIR AND TESTING OF A VOLTAGE REGULATOR, MANUFACTURED BY NEI PEEBLES, FOR TURKEY POINT, VOLTAGE INSTABILITY WAS OBSERVED. THE CAUSE WAS DETERMINED TO BE DUE TO FOREIGN MATERIAL ON THE STATIONARY WIPER PORTION OF THE R4 VOLTAGE ADJUST POTENTIOMETER. THE POTENTIOMETER IS 250 OHM, 2W, MANUFACTURED BY CHICAGO TELEPHONE SUPPLY, P/N 115R251A AND HAS BEEN USED BY NEI FOR OVER 20 YEARS FOR THIS APPLICATION. THE FOLLOWING U.S. CUSTOMERS AFFECTED ARE: 1. OCONEE 2. ST LUCIE-2 3. TURKEY POINT 4. GRAND GULF 5. KESSELRING 6. TROJAN 7. SUSQUEHANNA 8. RANCHO SECO 9. WATTS BAR 10. SEQUOYAH 11. POINT BEACH

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021