Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Morning Report for April 28, 2005

Headquarters Daily Report

To top of page

REGION I

Millstone 1 Flanders Line Fire

Licensee/Facility:

DOMINION NUCLEAR CONNECTICUT, INC.
Millstone 1
WATERFORD, Connecticut
Dockets: 05000245
[1] GE-3
License No:
Notification:

MR Number: 1-2005-0002
Date: 04/27/2005

Call from SRI

Discussion:

On Wednesday, April 27, 2005, at approximately 06:45 a.m., Millstone Unit 1 lost power to the spent fuel pool pumps when a transient caused the Flanders Line main breaker to open and automatically re-close. The licensee observed smoke, some arcing, and small flames on a utility pole located outside the protected area. The spent fuel pools pumps were returned to service when power was restored at 08:59 am.

During this short period no significant increase in spent fuel pool temperature occurred. It should be noted that the time to boil for the Unit 1 spent fuel pool is in excess of several days.

Accession Numbers:

Accession No Accession Date
ML051180534 04/27/2005

Contacts:

Name Office Abbrev Phone No E-Mail
PRINCE, ROBERT J R1 (610) 337-5376 RJP4@nrc.gov