The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Morning Report for March 25, 2004

Headquarters Daily Report

To top of page

REGION III

Davis-Besse Plant Status

Licensee/Facility:

FIRSTENERGY NUCLEAR OPERATING CO.
Davis-Besse
AKRON, Ohio
Dockets: 05000346
[1] B&W-L-LP
License No:
Notification:

MR Number: 3-2004-0023
Date: 03/25/2004

RIII-Via Telconf. with Site

Discussion:

This information is current as of 9:00 am (EST) on March 25, 2004. Davis-Besse completed its maintenance outage to repair feed water and steam line turbine bypass valves and recommenced start-up activities. The plant is currently in Mode 3 at 430OF and 1470 psig. The plant entered Mode 3 (reactor coolant temperature >280OF) at 12:30 pm March 24 and expects to enter Mode 2 by early morning March 26.

Ongoing resident inspector coverage, and enhanced inspection oversight will continue to be utilized to evaluate operational evolutions. During the maintenance outage, inspection oversight was reduced to two-shift coverage. Around-the-clock oversight will be re-initiated on March 25 at 4:00 p.m., and will continue during operational evolutions until full power routine operations are achieved.


Regional Action: For Information Only

Accession Numbers:

Accession No Accession Date
ML040850288 03/25/2004