Morning Report for January 14, 2004
Headquarters Daily Report
N/A
Part 21 - 2003-0031-00 - Initial/Interim Report on Fuel Assembly Bow
Licensee/Facility:
FRAMATOME ANP Dockets: License No: | Notification:
MR Number: H-2004-0002 Date: 12/09/2003 |
Discussion:
Part 21 - 2003-0031-00 - Initial/Interim Report on Fuel Assembly Bow
FANP is reevaluating their fuel assembly bow analyses for Mark-B and Mark-BW fuel. The ongoing evaluation of the methodology will include additional investigations on the gap size assumed in the analysis. In addition, the entire analytical approach, including the assumptions used, will be evaluated as a whole to determine whether any changes in the methodology are appropriate to ensure adequate safety. No conclusions have been reached by Framatome ANP regarding reportability under Part 21 at this time. The scheduled evaluation completion date is 12/17/2004. Further information regarding this Interim report is available on ADAMS at accession number ML033460173.
Accession Numbers:
Accession No | Accession Date |
ML033460173 | 12/09/2003 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
DOZIER, IRA (JERRY) | NRR | (301) 415-1014 | JXD@nrc.gov |
N/A
Part 21 - 2003-0028-00 - Potential Defective Solid State Protection Master Relay
Licensee/Facility:
SOUTH CAROLINA ELECTRIC & GAS CO. SUMMER COLUMBIA, South Carolina Dockets: 05000395 License No: | Notification:
MR Number: H-2004-0003 Date: 12/01/2003 |
Source Document: Call / Fax from Licensee
Reviewer: BRETT RINI
Discussion:
Part 21 - 2003-0028-00 - Solid State Protection Master Relay
This Morning Report is being issued due to a safety concern regarding the failure of Master Relay K507 (MidTex Part Number 156-14D200) in the Solid State Protection System (SSPS) at Summer. This failure occurred on 10/03/03 and was reported on 12/01/03 in EN 40364. The failures were attributed to corrosion caused by off-gassing of chlorine contamination from paper used to wrap the relay coil, or the adhesive used to attach the paper wrap to the coil. Another MidTex P/N 156-14D200 relay with a paper wrapped coil was sent to Pentas for followup analysis, and it showed evidence of the same type of corrosion. Therefore, the failure of Master Relay K507 is considered to be a manufacturing defect in a basic component that could cause a loss of safety function.
According to the licensee, the majority of MidTex relays investigated had cloth wrapped coils and these relays showed no evidence of the corrosion found on paper wrapped coils.
Upon energization, master relays must change state to actuate various safety related equipment in the plant. The number of affected relays and installed locations was not available at the time of the initial notification. The NRC staff has requested additional information from the licensee pertaining to this issue and is awaiting a reply. As the licensee provides more information, it will be posted to our webpage.
Information regarding this issue as well as other NRC operating experience is available at: http://www.nrc.gov/reading-rm/doc-collections/event-status/
Accession Numbers:
Accession No | Accession Date |
ML033370799 | 12/01/2003 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
RINI, BRETT A | NRR | (301) 415-3931 | BAR3@nrc.gov |
REGION III
American Electric Power Names Robert Gillespie as D. C. Cook Plant Operations Director
Licensee/Facility:
INDIANA MICHIGAN POWER CO. D.C. Cook 1, D.C. Cook 2 BUCHANAN, Michigan Dockets: 05000315, 05000316 [1] W-4-LP, [2] W-4-LP License No: | Notification:
MR Number: 3-2004-0001 Date: 01/13/2004 Corp. Communications |
Discussion:
On January 13, 2004, Mano Nazar, Senior Vice President and Chief Nuclear Officer, announced that Robert Gillespie will succeed Susan Simpson as the D.C. Cook Plant Operations Director. Mr. Gillespie is expected to assume his new position within the next 2weeks. Mr. Gillespie will join AEP from the Nuclear Management Company, where he was recently the Operations Manager at the Prairie Island Nuclear Plant. Ms. Simpson will become the Learning Organization Department Manager effective February 1, 2004.
These management changes were announced to better align the licensee's organization in support of its Recovery Plan to improve plant performance.
Accession Numbers:
Accession No | Accession Date |
ML040140176 | 01/13/2004 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
DUNCAN, E R | R3 | (360) 829-9628 | ERD@nrc.gov |
REGION III
Management Changes in Exelon
Licensee/Facility:
EXELON GENERATION CO., LLC Dresden 1, Dresden 2, Dresden 3 WARRENVILLE, Illinois Dockets: 05000010, 05000237, 05000249 [1] GE-1, [2] GE-3, [3] GE-3 License No: | Notification:
MR Number: 3-2004-0002 Date: 01/13/2004 Resident Inspector |
Discussion:
Exelon recently announced the following changes in its management structure:
Mike Bemis Resigns as President, Exelon Energy Delivery.
Jack Skolds Transition from President ( Exelon Nuclear) to Executive Vice-President (Exelon) and President,
. Exelon Energy Delivery.
Chris Crane Transition from Chief Operating Officer (Exelon Nuclear) to President (Exelon Nuclear) - replaces
. Skolds.
James Meister Transition from Vice-President Engineering (Exelon Nuclear) to Vice-President of Nuclear Services
. (Exelon Nuclear).
Amir Shahkarami Transition from Dresden Engineering Manager to Vice-President Engineering (Exelon Nuclear) -
. replaces Meister.
These changes expected to be effective at the end of January 2004.
Accession Numbers:
Accession No | Accession Date |
ML040140282 | 01/13/2004 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
STONE, A M | R3 | (630) 829-9729 | AMS1@nrc.gov |
REGION III
Management Changes in Exelon
Licensee/Facility:
EXELON GENERATION CO., LLC Braidwood 1, Braidwood 2 WARRENVILLE, Illinois Dockets: 05000456, 05000457 [1] W-4-LP, [2] W-4-LP License No: | Notification:
MR Number: 3-2004-0003 Date: 01/13/2004 Resident Inspector |
Discussion:
Exelon recently announced the following changes in its management structure:
Mike Bemis Resigns as President, Exelon Energy Delivery.
Jack Skolds Transition from President ( Exelon Nuclear) to Executive Vice-President (Exelon) and President,
. Exelon Energy Delivery.
Chris Crane Transition from Chief Operating Officer (Exelon Nuclear) to President (Exelon Nuclear) - replaces
. Skolds.
James Meister Transition from Vice-President Engineering (Exelon Nuclear) to Vice-President of Nuclear Services
. (Exelon Nuclear).
Amir Shahkarami Transition from Dresden Engineering Manager to Vice-President Engineering (Exelon Nuclear) -
. replaces Meister.
These changes expected to be effective at the end of January 2004.
Accession Numbers:
Accession No | Accession Date |
ML040140299 | 01/13/2004 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
STONE, A M | R3 | (630) 829-9729 | AMS1@nrc.gov |
REGION III
Management Changes in Exelon
Licensee/Facility:
EXELON GENERATION CO., LLC La Salle 1, La Salle 2 WARRENVILLE, Illinois Dockets: 05000373, 05000374 [1] GE-5, [2] GE-5 License No: | Notification:
MR Number: 3-2004-0004 Date: 01/13/2004 Resident Inspector |
Discussion:
Exelon recently announced the following changes in its management structure:
Mike Bemis Resigns as President, Exelon Energy Delivery.
Jack Skolds Transition from President ( Exelon Nuclear) to Executive Vice-President (Exelon) and President,
. Exelon Energy Delivery.
Chris Crane Transition from Chief Operating Officer (Exelon Nuclear) to President (Exelon Nuclear) - replaces
. Skolds.
James Meister Transition from Vice-President Engineering (Exelon Nuclear) to Vice-President of Nuclear Services
. (Exelon Nuclear).
Amir Shahkarami Transition from Dresden Engineering Manager to Vice-President Engineering (Exelon Nuclear) -
. replaces Meister.
These changes expected to be effective at the end of January 2004.
Accession Numbers:
Accession No | Accession Date |
ML040140312 | 01/13/2004 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
STONE, A M | R3 | (630) 829-9729 | AMS1@nrc.gov |
REGION III
Management Changes in Exelon
Licensee/Facility:
EXELON GENERATION CO., LLC Quad Cities 1, Quad Cities 2 WARRENVILLE, Illinois Dockets: 05000254, 05000265 [1] GE-3, [2] GE-3 License No: | Notification:
MR Number: 3-2004-0005 Date: 01/13/2004 Resident Inspector |
Discussion:
Exelon recently announced the following changes in its management structure:
Mike Bemis Resigns as President, Exelon Energy Delivery.
Jack Skolds Transition from President ( Exelon Nuclear) to Executive Vice-President (Exelon) and President,
. Exelon Energy Delivery.
Chris Crane Transition from Chief Operating Officer (Exelon Nuclear) to President (Exelon Nuclear) - replaces
. Skolds.
James Meister Transition from Vice-President Engineering (Exelon Nuclear) to Vice-President of Nuclear Services
. (Exelon Nuclear).
Amir Shahkarami Transition from Dresden Engineering Manager to Vice-President Engineering (Exelon Nuclear) -
. replaces Meister.
These changes expected to be effective at the end of January 2004.
Accession Numbers:
Accession No | Accession Date |
ML040140331 | 01/13/2004 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
STONE, A M | R3 | (630) 829-9729 | AMS1@nrc.gov |
REGION III
Management Changes in Exelon
Licensee/Facility:
EXELON GENERATION CO., LLC Byron 1, Byron 2 WARRENVILLE, Illinois Dockets: 05000454, 05000455 [1] W-4-LP, [2] W-4-LP License No: | Notification:
MR Number: 3-2004-0006 Date: 01/13/2004 Resident Inspector |
Discussion:
Exelon recently announced the following changes in its management structure:
Mike Bemis Resigns as President, Exelon Energy Delivery.
Jack Skolds Transition from President ( Exelon Nuclear) to Executive Vice-President (Exelon) and President,
. Exelon Energy Delivery.
Chris Crane Transition from Chief Operating Officer (Exelon Nuclear) to President (Exelon Nuclear) - replaces
. Skolds.
James Meister Transition from Vice-President Engineering (Exelon Nuclear) to Vice-President of Nuclear Services
. (Exelon Nuclear).
Amir Shahkarami Transition from Dresden Engineering Manager to Vice-President Engineering (Exelon Nuclear) -
. replaces Meister.
These changes expected to be effective at the end of January 2004.
Accession Numbers:
Accession No | Accession Date |
ML040140345 | 01/13/2004 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
STONE, A M | R3 | (630) 829-9729 | AMS1@nrc.gov |
REGION III
Management Changes in Exelon
Licensee/Facility:
AMERGEN ENERGY CO., LLC Clinton WARRENVILLE, Illinois Dockets: 05000461 [1] GE-6 License No: | Notification:
MR Number: 3-2004-0007 Date: 01/13/2004 Resident Inspector |
Discussion:
Exelon recently announced the following changes in its management structure:
Mike Bemis Resigns as President, Exelon Energy Delivery.
Jack Skolds Transition from President ( Exelon Nuclear) to Executive Vice-President (Exelon) and President,
. Exelon Energy Delivery.
Chris Crane Transition from Chief Operating Officer (Exelon Nuclear) to President (Exelon Nuclear) - replaces
. Skolds.
James Meister Transition from Vice-President Engineering (Exelon Nuclear) to Vice-President of Nuclear Services
. (Exelon Nuclear).
Amir Shahkarami Transition from Dresden Engineering Manager to Vice-President Engineering (Exelon Nuclear) -
. replaces Meister.
These changes expected to be effective at the end of January 2004.
Accession Numbers:
Accession No | Accession Date |
ML040140362 | 01/13/2004 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
STONE, A M | R3 | (630) 829-9729 | AMS1@nrc.gov |
Page Last Reviewed/Updated Wednesday, March 24, 2021