Morning Report for September 12, 2003

Headquarters Daily Report

To top of page

REGION III

Entry into Mode 4 and Mode 3

Licensee/Facility:

FIRSTENERGY NUCLEAR OPERATING CO.
Davis-Besse
OAK HARBOR, Ohio
Dockets: 05000346
[1] B&W-L-LP
License No:
Notification:

MR Number: 3-2003-0012
Date: 09/12/2003

Inspector at Site

Discussion:

The plant is expected to enter Mode 4 (280>Tavg>200) this evening and Mode 3 (Tavg*280) six hours later to establish plant conditions for conduct of the normal operating pressure (NOP) test. For the NOP test the licensee plans to pressurize the reactor coolant system to approximately normal operating pressure (2155psig) and hold for seven days and inspect the incore monitoring instrumentation nozzle penetrations on the bottom of the reactor vessel. The licensee is performing the test to check for signs of unidentified or pressure boundary leakage. During the NOP test the licensee plans to conduct other inspections and tests of various equipment in the primary and secondary systems. The three NRC resident inspectors assigned to the plant, assisted by inspectors from the Region III office, will monitor the utility's performance during the Mode changes and NOP test with expanded shift coverage. In addition, a focused inspection is planned to be conducted by a Region III senior metallurgist to observe the test and independently review the utility's test data and results. Following the NOP test, the plant is expected to re-enter Mode 5 to perform additional primary system inspections and tests and other work activities.

Regional Action: For Information Only

Accession Numbers:

Accession No Accession Date
ML032550172 09/12/2003