Morning Report for August 26, 1999
Headquarters Daily Report AUGUST 26, 1999 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS X REGION I X REGION II X REGION III X REGION IV X PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I AUGUST 26, 1999 Licensee/Facility: Notification: Vermont Yankee Nuclear Power Corp. MR Number: 1-99-0030 Vermont Yankee 1 Date: 08/26/99 Vernon,Vermont RI VIA TELECON Dockets: 50-271 BWR/GE-4 Subject: NEW FUEL HANDLING PROBLEM Discussion: On August 25, 1999, operators were moving new fuel bundles (non-irradiated) from the new fuel preparation machine to storage locations in the spent fuel pool in preparation for the upcoming refueling outage. During one move, the refueling mast made contact with the preparation machine and the mast became pinched between the refueling bridge and preparation machine. The problem occurred when the refueling bridge computer, operating on automatic, permitted a move of the bundle out of the preparation machine in a diagonal direction. Preliminary information suggests that operators should have manually controlled this movement. Neither training nor procedures reflected the necessity for this manual action. The new fuel bundle was not damaged and an inspection of the mast found it to be structurally sound. The licensee determined that the bundle is properly secured by the fuel handling equipment and does not present a hazard to the irradiated fuel bundles in the spent fuel pool. The licensee has initiated several review teams to develop the recovery plan and perform a root cause evaluation of the event. Regional Action: The resident inspectors are on-site and will monitor the licensee's recovery efforts. Contact: Clifford Anderson (610)337-5227 Brian McDermott (802)257-4319 _
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021