Event Notification Report for March 7, 2003
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 03/06/2003 - 03/07/2003 ** EVENT NUMBERS ** 39638 39639 +------------------------------------------------------------------------------+ |Transportation |Event Number: 39638 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: STATE OF WV RAD HEALTH PROGRAM |NOTIFICATION DATE: 03/06/2003| |LICENSEE: UNKNOWN |NOTIFICATION TIME: 01:24[EST]| | CITY: PARKERSBURG REGION: 2 |EVENT DATE: 03/06/2003| | COUNTY: STATE: WV |EVENT TIME: 01:15[EST]| |LICENSE#: AGREEMENT: N |LAST UPDATE DATE: 03/06/2003| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |CAROLYN EVANS R2 | | |C.W. (BILL) REAMER NMSS | +------------------------------------------------+JOSEPH HOLONICH IRO | | NRC NOTIFIED BY: DAN HILL |NANCY OSGOOD DOT | | HQ OPS OFFICER: HOWIE CROUCH |GIBSON DOE | +------------------------------------------------+CAPT. HOLLAND LLEA | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NINF INFORMATION ONLY | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AUTOMOBILE ACCIDENT INVOLVING RADIOGRAPHY SOURCE | | | | At 0124 EST on 3/06/2003, NRC Headquarters was contacted by State of WV | | Radiation Health Program that an automobile/truck accident had occurred in | | Parkersburg, West Virginia that involved a Iridium-192 radiography source. | | Local HazMat responders do not have radiation monitoring equipment. | | Currently, LLEA is in contact with Camden-Clark Hospital to obtain proper | | radiation monitoring equipment to determine if packaging is intact. (It was | | determined that Camden-Clark is unable to respond). Vehicle is located in | | local towing impound yard. West Virginia will be responding in the morning | | to perform surveys. | | | | Notified NMSS EO (Reamer), R2DO (Evans), DIRO Mgr. (Holonich), NRC | | Transportation (Osgood), DOT (LT. (jg) Johnson) and DOE (Gibson). | | | | * * * * UPDATE FROM D. HILL TO M. RIPLEY AT 1250 EST 3/6/03 * * * | | | | The State of WV Radiation Health Program completed an inspection and | | radiation survey. The Iridium-192 radiography source was found intact. | | Radiation levels were normal and there was no spread of radioactivity. The | | radiography equipment was released to the licensee for transport back to the | | work site where it was being used. | | | | Notified NMSS EO (Reamer), R2DO (Evans & Pelchat), DIRO Mgr. (Holonich), | | DOT-NRC Watch Officer, DOT (LT. Higgins), DOE Watch Officer, NTSB | | (Belchius), USCG (LT. Gross), EPA R3 (Minnick). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 39639 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: HOLTEC INTERNATIONAL |NOTIFICATION DATE: 03/06/2003| |LICENSEE: AALBORG |NOTIFICATION TIME: 14:10[EST]| | CITY: REGION: |EVENT DATE: 01/03/2003| | COUNTY: STATE: |EVENT TIME: [EST]| |LICENSE#: AGREEMENT: N |LAST UPDATE DATE: 03/06/2003| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |MOHAMED SHANBAKY R1 | | |CAROLYN EVANS R2 | +------------------------------------------------+MONTE PHILLIPS R3 | | NRC NOTIFIED BY: HOLTEC (fax) |DALE POWERS R4 | | HQ OPS OFFICER: MIKE RIPLEY |TERRY REIS NRR | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |CCCC 21.21 UNSPECIFIED PARAGRAPH | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | PART 21 NOTIFICATION - AALBORG FLOW METERS | | | | Holtec International reports a potential defect in Aalborg model GFM671S | | mass flow rate meters. The instruments are used to verify the correct | | amount of helium is backfilled into dry spent fuel storage canisters. These | | instruments were never used on a Holtec cask system containing spent nuclear | | fuel because the problem was discovered during the preparatory phase before | | fuel loading. | | | | Four meters were purchased for use at the Trojan nuclear plant to measure | | the amount of helium gas injected into a loaded Holtec dry spent fuel | | Multipurpose Canister (MPC). It was determined that erroneous data was | | coming from the flow rate meters. It was determined by Aalborg that the | | published correction factors for helium/nitrogen were incorrect for this | | model flow meter. At the time the discrepant condition was identified, none | | of the flow meters had been used on an MPC loaded with spent fuel and they | | were subsequently removed from service until they could be correctly | | calibrated. | | | | Four flow rate meters were procured and delivered to the Trojan nuclear | | power plant. Three were not used in actual fuel loading activities due to | | the discovery of the mis-calibration during dry run activities. The fourth | | flow rate meter has been removed from the site. | | | | Aalborg is developing new helium correction factors. In the interim, they | | have committed to using helium to calibrate all flow meters destined for use | | in measuring helium. | | | | Trojan plant was the first plant where flow rate meters and flow totalizers | | were to be used to confirm adequate helium backfill in Holtec MPCs loaded | | with spent fuel. Therefore, no other Holtec client is affected for past | | loading operations. For future MPC loading operations, Holtec users, as well | | as other purchasers and licensees are being notified via this report that | | Aalborg flow meters procured for use in important-to-safety activities may | | not be calibrated correctly and that certain catalogue correction factors | | have been determined to be incorrect. The calibration of Aalborg flow | | meters should be confirmed prior to use in important-to-safety activities. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021