Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Event Notification Report for September 18, 2002


                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           09/17/2002 - 09/18/2002

                              ** EVENT NUMBERS **

39193  39195  

+------------------------------------------------------------------------------+
|Research Reactor                                 |Event Number:   39193       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: TEXAS A&M UNIVERSITY                 |NOTIFICATION DATE: 09/17/2002|
|   RXTYPE: 1000 KW TRIGA (CONVERSION)           |NOTIFICATION TIME: 08:25[EDT]|
| COMMENTS:                                      |EVENT DATE:        09/17/2002|
|                                                |EVENT TIME:        06:30[CDT]|
|                                                |LAST UPDATE DATE:  09/17/2002|
|    CITY:  COLLEGE STATION          REGION:  4  +-----------------------------+
|  COUNTY:  BRAZOS                    STATE:  TX |PERSON          ORGANIZATION |
|LICENSE#:  R-83                  AGREEMENT:  Y  |DAVE LOVELESS        R4      |
|  DOCKET:  05000128                             |TAD MARSH            NRR     |
+------------------------------------------------+JIM DUNKER           FEMA    |
| NRC NOTIFIED BY:  ASHER                        |MARVIN MENDONCA      PM      |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          UNUSUAL EVENT         |                             |
|10 CFR SECTION:                                 |                             |
|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| REACTOR RECEIVED POOL LEVEL ALARM DUE TO LEAK FROM A DIFFUSER LINE           |
|                                                                              |
|                                                                              |
| An unusual event occurred when the pool level alarm tripped due to the pool  |
| level going below the setpoint.  This occurred due to a leak possibly on a   |
| pool diffusion system line.  Approximately 10,000 gallons of water leaked    |
| into the sump and is being pumped into their liquid storage tanks.  They     |
| believe the leak may be due to a faulty coupling.   They isolated the leak   |
| and refilling the pool at the rate of 25gpm.  There was no increase in       |
| radiation levels and the core was not uncovered (a minimum of 15' of water   |
| is above the core).                                                          |
|                                                                              |
|                                                                              |
| * * * UPDATE ON 09/17/2002 @ 0929 BY SPELLMAN TO GOULD * * *                 |
|                                                                              |
| The NOUE was terminated at 0820 CDT when the pool level was return to above  |
| the pool level alarm setpoint.                                               |
|                                                                              |
| Notified RDO (Loveless), NRR EO(Marsh), PM (Mendonca via NRR EO), and FEMA   |
| (Duncan)                                                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39195       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PERRY                    REGION:  3  |NOTIFICATION DATE: 09/17/2002|
|    UNIT:  [1] [] []                 STATE:  OH |NOTIFICATION TIME: 18:27[EDT]|
|   RXTYPE: [1] GE-6                             |EVENT DATE:        09/17/2002|
+------------------------------------------------+EVENT TIME:        15:50[EDT]|
| NRC NOTIFIED BY:  ALAN RABENOLD                |LAST UPDATE DATE:  09/17/2002|
|  HQ OPS OFFICER:  MIKE NORRIS                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |ANNE MARIE STONE     R3      |
|10 CFR SECTION:                                 |                             |
|HFIT 26.73               FITNESS FOR DUTY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| A  LICENSED SUPERVISORY OPERATOR TESTED POSITIVE FOR ALCOHOL DURING A RANDOM |
| FITNESS-FOR-DUTY TEST                                                        |
|                                                                              |
| The employee's access has been suspended.                                    |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
|                                                                              |
| Contact the HOO for additional information.                                  |
+------------------------------------------------------------------------------+

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021