Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Proposed Final Regulatory Guide 1.51, Revision 3, "Design, Inspection, and Testing Criteria for Air

June 11, 2001

MEMORANDUM TO: William D. Travers
Executive Director for Operations

          /RA/
FROM: John T. Larkins, Executive Director
Advisory Committee on Reactor Safeguards
 
SUBJECT: PROPOSED FINAL REGULATORY GUIDE 1.52, REVISION 3, "DESIGN, INSPECTION, AND TESTING CRITERIA FOR AIR FILTRATION AND ADSORPTION UNITS OF POST-ACCIDENT ENGINEERED-SAFETY-FEATURE ATMOSPHERE CLEANUP SYSTEMS IN LIGHT-WATER-COOLED NUCLEAR POWER PLANTS"

During the 483rd meeting of the Advisory Committee on Reactor Safeguards, June 6-8, 2001, the Committee considered the subject proposed final regulatory guide and decided not to review it. The Committee has no objection to issuing the final regulatory guide for industry use.

Reference:

Memorandum to ACRS Members , from P. Boehnert, ACRS Staff, Subject: Revision 3 to Regulatory Guide 1.52 (DG-1102): Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Post-Accident-Engineered-Safety-Feature (ESF) Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants, dated May 24, 2001.

cc: A. Vietti-Cook, SECY
J. Craig, OEDO
I. Schoenfeld, OEDO
A. Thadani, RES
S. Collins, NRR
B. Sheron, NRR
G. Holahan, NRR
J. Hannon, NRR
J. Segala, NRR