Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Proposed Revision 3 to Regulatory Guide 1.52, “Design, Inspection, and Testing Criteria for Air Filt

July 18, 2000

MEMORANDUM TO:   William D. Travers
Executive Director for Operations
/RA/
FROM: John T. Larkins, Executive Director
Advisory Committee on Reactor Safeguards
SUBJECT:   PROPOSED REVISION 3 TO REGULATORY GUIDE 1.52, "DESIGN, INSPECTION, AND TESTING CRITERIA FOR AIR FILTRATION AND ADSORPTION UNITS OF POST-ACCIDENT ENGINEERED-SAFETY-FEATURE ATMOSPHERE CLEANUP SYSTEMS IN LIGHT-WATER-COOLED NUCLEAR POWER PLANTS."

During the 474th meeting of the Advisory Committee on Reactor Safeguards, July 12-14, 2000, the Committee considered the subject draft regulatory guide. The Committee has no objection to the publication of this regulatory guide.

Reference:

Draft Regulatory Guide DG-1102, Proposed Revision 3 to Regulatory Guide 1.52, "Design, Inspection, And Testing Criteria For Air Filtration And Adsorption Units of Post-Accident Engineered-Safety-Feature Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants," July 7, 2000.

cc:   A. Vietti-Cook, SECY
J. Craig, OEDO
G. Millman, OEDO
S. Collins, NRR
G. Holahan, NRR
J. Hannon, NRR
J. Segala, NRR

Page Last Reviewed/Updated Monday, July 25, 2016

Page Last Reviewed/Updated Monday, July 25, 2016