PRESENTATION SCHEDULE
Contact: | Michael R. Snodderly (301/415-6927)(Michael.Snodderly@nrc.gov) | |||
TOPIC | PRESENTER | TIME | ||
---|---|---|---|---|
I. | Introduction | G. Wallis, Chairman D. Dorman, RES G. Holahan, NRR | 1:00 p.m. | |
II. | Status and Proposed Resolution Of GSI-191: "Assessment of Debris" Accumulation on PWR Sump Performance | R. Architzel, NRR | ||
III. | NRC Documents for Resolution Of GSI-191 | |||
A. | Draft Generic Letter 2003-XX: Potential Impact of Debris Blockage On Emergency Recirculation During Design-Basis Accidents at PWRs
| R. Architzel, NRR J. Lehning, NRR | 1:15 p.m. | |
B. | Draft Regulatory Guide, DG-1107: "Water Sources for Long-Term Recirculation Cooling Following A Loss-Of- Coolant Accident"
| B. P. Jain, RES D. V. Rao, LANL | 2:15 p.m. | |
C. | Draft Regulatory Guide, DG-1107: "Water Sources for Long-Term Recirculation Cooling Following A Loss-Of- Coolant Accident"
| B. P. Jain, RES D. V. Rao, LANL | ||
**BREAK*** | 3:30 p.m. | |||
IV. | NEI Comments on Resolution og GSI-191 | J. Butler, NEI | 3:45 p.m. | |
A. Introduction B. NEI Evaluation Methodology (Ground Rules) C. NEI Guidance - Coordination With NRC Resolution Approach D. Resolution Schedule | ||||
V. | Subcommittee Caucus | 4:45 p.m. | ||
A. | Comments on Meeting Presentations | |||
B. | Follow-on Actions | |||
C. | Decision Regarding Future Action on This Matter by ACRS | |||
VI. | Adjourn | 5:00 p.m. |
Note:
- Presentation time should not exceed 50% of the total time allocated for a specific item.
- Number of copies of presentation materials to be provided to the ACRS - 35.