Meeting Info

Purpose
This is a public meeting between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Operations, Inc., to present the results of the NRC’s annual assessment of safety performance at the Grand Gulf Nuclear Station (GGNS), during the calendar year 2017. For reference, the NRC’s annual assessment letter may be accessed via Agencywide Documents Access and Management System (ADAMS) Accession No. ML18057B123 at http://www.nrc.gov/reading-rm/adams.html.
Meeting Dates and Times
03/20/18, 5:30PM - 7PM EDT
Meeting Location
Hampton Inn & Suites Vicksburg

3330 Clay St.
Vicksburg, MS

Contact
Jason Kozal
(817) 200-1144
Participation Level
Category 1
NRC Participants
Region IV
External Participants
Entergy Operations Inc
- Ayesha Athar, Acting Resident Inspector, Grand Gulf
- Bob Franssen, GGNS, General Manager, Plant Operations
- Cale Young, Senior Project Engineer, DRP
- Eric Larson, GGNS Site Vice President
- Gregory Hawkins , GGNS, Regulatory Director
- Jason Kozal, Branch Chief, DRP
- Neil Day, Acting Senior Resident Inspector, Grand Gulf
- Ryan Lantz, Deputy Director, DRP
Docket Numbers - Facility Names
05000416 - Grand Gulf 1
Related Documents
ML18057B123 - Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2017006).
ML18064A361 - 03/20/2018 Public Meeting with Entergy Operations, Inc. (Grand Gulf Nuclear Station)