Home > NRC Library > ADAMS Public Documents
Cooper Nuclear Station Submittal of Revision 31 to Updated Safety Analysis Report
Accession Number: ML23129A261
Date Released: Thursday, September 28, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23129A282 - Cooper Nuclear Station Submittal of Revision 31 to Updated Safety Analysis Report (18 page(s), 4/20/2023)
- ML23129A296 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, List of Effective Pages (4/20/2023)
- ML23129A310 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Table of Contents (4/20/2023)
- ML23129A265 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, List of Figures (4/20/2023)
- ML23129A280 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, List of Tables (4/20/2023)
- ML23129A269 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section I, Introduction and Summary (4/20/2023)
- ML23129A264 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section I, Figures (4/20/2023)
- ML23129A291 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section II, Station Site And Environs (4/20/2023)
- ML23129A307 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section II, Figures (4/20/2023)
- ML23129A295 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section III, Reactor (4/20/2023)
- ML23129A274 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section III Figures III-2-1 To III-10-1 (4/20/2023)
- ML23129A286 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section IV, Reactor Coolant System (4/20/2023)
- ML23129A281 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section IV, Figures (4/20/2023)
- ML23129A292 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section V, Containment (4/20/2023)
- ML23129A284 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section V, Figures (4/20/2023)
- ML23129A272 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section VI, Emergency Core Cooling Systems (4/20/2023)
- ML23129A276 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section VI, Figures (4/20/2023)
- ML23129A270 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section VII, Control And Instrumentation (4/20/2023)
- ML23129A304 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section VII, Figures (4/20/2023)
- ML23129A271 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section VIII, Electrical Power Systems (4/20/2023)
- ML23129A267 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section VIII, Figures (4/20/2023)
- ML23129A285 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section IX, Radioactive Waste Systems (4/20/2023)
- ML23129A277 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section X, Auxiliary Systems (4/20/2023)
- ML23129A293 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section X, Figures (4/20/2023)
- ML23129A278 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section XI, Power Conversions Systems (4/20/2023)
- ML23129A297 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section XII, Structures And Shielding (4/20/2023)
- ML23129A305 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section XIII, Conduct Of Operations (4/20/2023)
- ML23129A275 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section XIII, Figures (4/20/2023)
- ML23129A303 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section XIV, Station Safety Analysis (4/20/2023)
- ML23129A306 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Section XIV, Figures XIV-4-1 To XIV-6-20 (4/20/2023)
- ML23129A289 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix A, Pressure Integrity Of Piping And Equipment Pressure Parts (4/20/2023)
- ML23129A298 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix B, Technical Specifications (4/20/2023)
- ML23129A268 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix C, Structural Loading Criteria (4/20/2023)
- ML23129A308 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix C, Figures C-2-2 To C-2-12 (4/20/2023)
- ML23129A290 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix D, Quality Assurance Program for Operations Policy Document (4/20/2023)
- ML23129A309 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix D(1), Construction Phase Quality Assurance Program (4/20/2023)
- ML23129A283 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix D(1), Figures (4/20/2023)
- ML23129A273 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix E (4/20/2023)
- ML23129A294 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix F, Conformance to AEC Proposed General Design Criteria (4/20/2023)
- ML23129A266 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix G, Nuclear Safety Operational Analysis (4/20/2023)
- ML23129A299 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix G, Figures (4/20/2023)
- ML23129A300 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix H, Station Research, Development, and Further Information, Requirements and Resolutions (4/20/2023)
- ML23129A288 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix J, Inservice Inspection Program (4/20/2023)
- ML23129A301 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Appendix K, License Renewal Supplement (4/20/2023)
- ML23129A302 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Technical Requirements Manual, Section 3 (4/20/2023)
- ML23129A287 - Cooper Nuclear Station, Fifth Ten-Year Interval ISI Program and Third Ten-Year Interval Containment Inservice Inspection Program, Revision 4 (9/14/2022)
- ML23129A279 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Plant Unique Analysis Report Mark I Containment Program (4/20/2023)
- ML23129A396 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 117C3346, Installation Penetration Seal-Medium Voltage Power (4/20/2023)
- ML23129A348 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 117C3349, Installation Penetration Seal - Indication And Control (4/20/2023)
- ML23129A383 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 161F282BC, Sheet 1, Process Diagram Core Spray System (4/20/2023)
- ML23129A402 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 197R567, Piping and Instrument Symbols, Sheet 1 (4/20/2023)
- ML23129A363 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 197R576, Sheet 1, Reactor (4/20/2023)
- ML23129A325 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2001, Sheet 1 of 2, Flow Diagram Symbols and Abbreviations (4/20/2023)
- ML23129A356 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2001, Flow Diagram Symbols & Abbreviations, Sheet 2 (4/20/2023)
- ML23129A326 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2002, Flow Diagram Main, Exhaust & Auxiliary Steam Systems, Sheet 1 (4/20/2023)
- ML23129A398 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2002, Flow Diagram Main, Exhaust & Auxiliary Steam Systems, Sheet 2 (4/20/2023)
- ML23129A340 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2004, Flow Diagram Condensate & Feed Water Systems, Sheet 1 (4/20/2023)
- ML23129A362 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2004, Sheet 2, Flow Diagram Condensate & Feedwater Systems (4/20/2023)
- ML23129A344 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2004, Flow Diagram Condensate & Feedwater Systems, Sheet 3 (4/20/2023)
- ML23129A418 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2006, Flow Diagram Circulating, Screen Wash & Service Water Systems, Sheet 1 (4/20/2023)
- ML23129A343 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2006, Sheet 2, Flow Diagram Circulating, Screen Wash & Service Water Systems (4/20/2023)
- ML23129A369 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2006, Flow Diagram Circulating, Screen Wash & Service Water Systems, Sheet 3 (4/20/2023)
- ML23129A361 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2006, Sheet 4, Flow Diagram Control Building Service Water System (4/20/2023)
- ML23129A357 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2007, Flow Diagram Turbine Building Closed Cooling Water System (4/20/2023)
- ML23129A323 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2009, Flow Diagram Air Removal System (4/20/2023)
- ML23129A384 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2010, Sheet 1, Flow Diagram Instrument Air Control & Turbine Building (4/20/2023)
- ML23129A390 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2010, Sheet 1A, Flow Diagram Instrument Air Control & Turbine Buildings (4/20/2023)
- ML23129A391 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2010, Flow Diagram Instrument Air Reactor Building, Sheet 2 (4/20/2023)
- ML23129A410 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2010, Sheet 3, Flow Diagram Service Air (4/20/2023)
- ML23129A338 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2010, Sheet 4, Flow Diagram Instrument Air Radwaste & Augmented Radwaste (4/20/2023)
- ML23129A377 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2010, Flow Diagram Instrument & Service Air Miscellaneous Details, Sheet 5 (4/20/2023)
- ML23129A378 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2012, Flow Diagram Electric Heating Boiler System, Sheet 3 (4/20/2023)
- ML23129A376 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2016, Sheet 1, Flow Diagram Fire Protection Turbine Generator Building (4/20/2023)
- ML23129A352 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2016, Flow Diagram Fire Protection Service Bldg's & Yard, Sheet 1A (4/20/2023)
- ML23129A417 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2016, Flow Diagram Fire Protection Cont. RDW & ARDW BLDG's, Sheet 1B (4/20/2023)
- ML23129A332 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2016, Sheet 1C, Flow Diagram Fire Protection Reactor Building (4/20/2023)
- ML23129A387 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2017, Flow Diagram Turb. & Radwaste Bldg. Contaminated Fl. Drain & Radwaste Roof Drain Sys (4/20/2023)
- ML23129A405 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2018, Flow Diagram Turbine Generator Bldg & Control Bldg Heating & Ventilating (4/20/2023)
- ML23129A374 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2019, Flow Diagram Main Control RM. Cable RM. & Computer RM Heating, Ventilating & Air Condition, Sheet 1 (4/20/2023)
- ML23129A337 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2019, Flow Diagram Chilled Water System Electrical Shop, Non-Critical Switchgear, Control & Officee Bldg, Sheet 2 (4/20/2023)
- ML23129A393 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2020, Flow Diagram Reactor Building Heating and Ventilating (4/20/2023)
- ML23129A327 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2021, Flow Diagram Radwaste Building Heating & Venting (4/20/2023)
- ML23129A354 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2026, Flow Diagram Reactor Vessel Instrumentation, Sheet 1 (4/20/2023)
- ML23129A355 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2027, Sheet 1, Flow Diagram "A" Reactor Recirculation & Suppression Chamber Vent Systems & Connections (4/20/2023)
- ML23129A380 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2027, Flow Diagram - Loop "B" Reactor Recirculation & Suppression Chamber Vent Systems & Connections, Sheet 2 (4/20/2023)
- ML23129A413 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2028, Flow Diagram Reactor Building & Drywell Equipment Drain System (4/20/2023)
- ML23129A364 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2030, Flow Diagram Fuel Pool Cooling And Clean-Up System, Sheet 1 (4/20/2023)
- ML23129A347 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2030, Flow Diagram Fuel Pool Cooling And Clean-Up System, Sheet 2 (4/20/2023)
- ML23129A320 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2031, Flow Diagram Reactor Building Closed Cooling Water System, Sheet 1 (4/20/2023)
- ML23129A339 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2031, Sheet 2, Flow Diagram Reactor Building - Closed Cooling Water System (4/20/2023)
- ML23129A403 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2031, Flow Diagram Reactor Building - Closed Cooling Water System, Sheet 3 (4/20/2023)
- ML23129A368 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2032, Flow Diagram High Conductivity (Floor Drains Chemical And Laundry Waste) Process, Sheet 1 (4/20/2023)
- ML23129A392 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2032, Flow Diagram High Conductivity (Floor Drains, Chemical And Laundry Waste) Process, Sheet 2 (4/20/2023)
- ML23129A414 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2032, Sheet 3, Flow Diagram High Conductivity (Floor Drains Chemical and Laundry Waste) Process (4/20/2023)
- ML23129A370 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2032, Flow Diagram High Conductivity (Floor Drains, Chemical and Laundry Wastes) Process, Sheet 4 (4/20/2023)
- ML23129A385 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2032, Flow Diagram High Conductivity (Floor Drains, Chemical & Laundry Waste) Process, Sheet 5 (4/20/2023)
- ML23129A319 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2033, Flow Diagram Low Conductivity (Equipment Drains) Processing, Sheet 1 (4/20/2023)
- ML23129A375 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2033, Flow Diagram Low Conductivity (Equipment Drains) Processing, Sheet 2 (4/20/2023)
- ML23129A346 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2033, Flow Diagram Low Conductivity (Equipment Drains Processing ), Sheet 3 (4/20/2023)
- ML23129A372 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2033, Flow Diagram Low Conductivity (Equipment Drains) Processing Sheet 4 (4/20/2023)
- ML23129A328 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2034, Flow Diagram Plant Make Up Water Treatment System (4/20/2023)
- ML23129A379 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2035, Flow Diagram Condensate Filter Demineralizer System, Sheet 1 (4/20/2023)
- ML23129A409 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2035, Flow Diagram Condensate Filter Demineralizer System, Sheet 2 (4/20/2023)
- ML23129A365 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2035, Revision 13, Flow Diagram Condensate Filter Demineralizer System, Sheet 3 (4/20/2023)
- ML23129A411 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2035, Flow Diagram Condensate Filter Demineralizer System, Sheet 4 (4/20/2023)
- ML23129A345 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2036, Flow Diagram Reactor Building Service Water System, Sheet 1 (4/20/2023)
- ML23129A336 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2037, Flow Diagram H & V Standby Gas Treatment & Off Gas Filters (4/20/2023)
- ML23129A404 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2038, Flow Diagram Reactor Building Floor & Roof Drain Systems, Sheet 1 (4/20/2023)
- ML23129A395 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2039, Flow Diagram Control Rod Drive Hydraulic System (4/20/2023)
- ML23129A349 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2040, Flow Diagram Residual heat Removal System, Sheet 1 (4/20/2023)
- ML23129A386 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2040, Sheet 2, Flow Diagram Residual Heat Removal System Loop "B" (4/20/2023)
- ML23129A359 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2042, Low Diagram Reactor Water Clean-Up System, Sheet 1 (4/20/2023)
- ML23129A381 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2042, Revision AB/16, Flow Diagram Reactor Water Clean Up System, Sheet 2 (4/20/2023)
- ML23129A330 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2042, Revision AD/24, Flow Diagram Reactor Water Clean Up System, Sheet 3 (4/20/2023)
- ML23129A358 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2043, Flow Diagram Reactor Core Isolation Coolant and Reactor Feed Systems (4/20/2023)
- ML23129A371 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2044, Flow Diagram - High Pressure Coolant Injection and Reactor Feed Systems (4/20/2023)
- ML23129A397 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2045, Rev. 58, Sheet 1, Flow Diagram Core Spray System (4/20/2023)
- ML23129A317 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2045, Flow Diagram Standby Liquid Control System, Sheet 2 (4/20/2023)
- ML23129A335 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2049, Flow Diagram Condensate Supply System, Sheet 3 (4/20/2023)
- ML23129A399 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2050, General Arrangement, Turbine Building, Basement Floor Plan, Withheld (4/20/2023)
- ML23129A394 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2051, General Arrangement, Turbine Building mezzanine Floor plan - Withheld (4/20/2023)
- ML23129A341 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2052, Withheld (4/20/2023)
- ML23129A412 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2053, Withheld (4/20/2023)
- ML23129A401 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2054, General Arrangement, Turbine Building, Section B-B, Withheld (4/20/2023)
- ML23129A367 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2056 General Arrangement, Intake Structure Plan and Sections (4/20/2023)
- ML23129A316 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2059, General Arrangement, Reactor Building, Plan Below Grade, Withheld (4/20/2023)
- ML23129A407 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2060 General Arrangement, Reactor Building, Plant at Elevation 903'-6", Withheld (4/20/2023)
- ML23129A333 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2061, General Arrangement, Reactor Building, Plan at Elevation 931'-6", Withheld (4/20/2023)
- ML23129A389 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2062, General Arrangement, Reactor Building, Plan At Elevation 958'-3", Withheld (4/20/2023)
- ML23129A353 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2063, General Arrangement, Reactor Building, Plan Elevation 976'-0", Withheld (4/20/2023)
- ML23129A416 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2064, General Arrangement, Reactor Building Plan at Elevation 1001-0", Withheld (4/20/2023)
- ML23129A366 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2065, General Arrangement, Reactor Building, Section A-A, Withheld (4/20/2023)
- ML23129A406 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2066, General Arrangement, Reactor Building, Section B-B, Withheld (4/20/2023)
- ML23129A329 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2067, General Arrangement, Reactor Building, Plans At Elevations 877'-6" And 903'-6", Withheld (4/20/2023)
- ML23129A324 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2068, General Arrangement, Reactor Building, Plans At Elevations 918'-0" And 934'-0", Withheld (4/20/2023)
- ML23129A373 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2069, General Arrangement, Radwaste Building Sections, Withheld (4/20/2023)
- ML23129A388 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2072, General Arrangement, Augmented Radwaste Building Plans, Withheld (4/20/2023)
- ML23129A408 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2073, General Arrangement, Augmented Radwaste Building Sections, Withheld (4/20/2023)
- ML23129A351 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2079, Flow Diagram Augmented Liquid Radwaste System, Sheet 1 (4/20/2023)
- ML23129A350 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2079, Rev. 31, Sheet 2, Flow Diagram Augmented Liquid Radwaste System (4/20/2023)
- ML23129A360 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2080, Flow Diagram Augmented Radwaste Building Equipment, Chemical & Floor Drains (4/20/2023)
- ML23129A334 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2084, Flow Diagram Stand by Nitrogen Injection System (4/20/2023)
- ML23129A321 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 2298, Radwaste Building, Conveyor Operating Areas Plans And Sections, Withheld (4/20/2023)
- ML23129A318 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3001, Main One Line Diagram (4/20/2023)
- ML23129A400 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3002, Auxiliary One Line Diagram MCC Z, SWGR Bus 1A, 1B, 1E, & Critical SWGR Bus 1F 1G, Sheet 1 (4/20/2023)
- ML23129A342 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3003, Auxiliary One Line Diagram Motor Control Centers A, B, F, & G, Sheet 2 (4/20/2023)
- ML23129A322 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3004, Auxiliary One Line Diagram MCCC C, D, H, J, DG1 & DG2, Sheet 3 (4/20/2023)
- ML23129A479 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W (4/20/2023)
- ML23129A439 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3006, Auxiliary One Line Diagram Starter Racks LZ And TZ MCC's K, L, LX, RA, RX, S, T, TX, X, Sheet 5 (4/20/2023)
- ML23129A441 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3007, Auxiliary One Line Diagram Motor control Centers E, Q, R, RB & Y, Sheet 6 (4/20/2023)
- ML23129A436 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3009, Sheet 1, One Line Switching Diagram 12.5 KV Ring Bas System (4/20/2023)
- ML23129A429 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3010, Vital One Line Diagram, Sheet 1 (4/20/2023)
- ML23129A501 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3058, DC One Line Diagram (4/20/2023)
- ML23129A430 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3070, Electrical Symbol List (4/20/2023)
- ML23129A444 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 3401, Rev. 33, Auxiliary One Line Diagram MCC, CA, CB, MR, OGI & OG2 (4/20/2023)
- ML23129A452 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 4003, Overall Site And Vicinity Plan, Withheld (4/20/2023)
- ML23129A488 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch) (4/20/2023)
- ML23129A486 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 4259, Rev. 10, Sheet 1, Containment Vessel Penetration Location (4/20/2023)
- ML23129A468 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 4259, Sheet 1A, Containment Vessel Penetration Schedule (4/20/2023)
- ML23129A453 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 4260, Sheet 2A, Containment Suppression Chamber Penetration Location (4/20/2023)
- ML23129A423 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 4260, Penetration Schedule, Sheet 2B (4/20/2023)
- ML23129A437 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 4286, Energy Absorbing Panel Liner Locations (4/20/2023)
- ML23129A467 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 6000302, P & I Diagram Augmented Offgas System, Sheet 1 (4/20/2023)
- ML23129A435 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 6000302, Sheet 2, P & I Diagram Augmented Offgas System (4/20/2023)
- ML23129A456 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 719E415BB, Nuclear Boiler, Sheet 1 (4/20/2023)
- ML23129A500 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 719E479BB, Process Radiation Monitoring System, Sheet 1 (4/20/2023)
- ML23129A420 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 719E580BB, Control Rod Drive Hydraulic System, Sheet 1 (4/20/2023)
- ML23129A451 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E174BB, Sheet 1, (4/20/2023)
- ML23129A438 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E211BB (4/20/2023)
- ML23129A496 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 1, Reactor Protection System (4/20/2023)
- ML23129A421 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 2, Reactor Protection System Functional Control Diagram (4/20/2023)
- ML23129A495 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 3, Reactor Protection System (4/20/2023)
- ML23129A492 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 1 (4/20/2023)
- ML23129A432 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 2 (4/20/2023)
- ML23129A491 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E402BB, Rev. 6, Sheet 1, Functional Control Diagram Core Spray System (4/20/2023)
- ML23129A499 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 1 (4/20/2023)
- ML23129A482 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram, Control Rod Drive Hydraulic System, Sheet 2 (4/20/2023)
- ML23129A428 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 3 (4/20/2023)
- ML23129A465 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive hydraulic System, Sheet 4 (4/20/2023)
- ML23129A484 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System (4/20/2023)
- ML23129A480 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 6 (4/20/2023)
- ML23129A477 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E471BB, Control Rod Drive Hydraulic System Sheet 7 (4/20/2023)
- ML23129A448 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E517BC, Sheet 1, Functional Control Diagram Reactor Core Isolation Cooling System (4/20/2023)
- ML23129A470 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E517BC, Functional Control Diagram Reactor Core Isolation Cooling System, Sheet 2 (4/20/2023)
- ML23129A475 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E517BC, Reactor Core Isolation Cooling System Functional Control Diagram, Sheet 3 (4/20/2023)
- ML23129A443 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E589BB, Functional Control Diagram High Pressure Coolant Injection System, Sheet 1 (4/20/2023)
- ML23129A427 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E589BB, Revision 6, High Pressure Coolant Injection System Functional Control Diagram, Sheet 2 (4/20/2023)
- ML23129A489 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E589BB, High Pressure Coolant Injection System Functional Control Diagram, Sheet 3 (4/20/2023)
- ML23129A471 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E719BC, Sheet 1, Process Diagram Reactor Core isolation Coolant System (4/20/2023)
- ML23129A455 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E720BB, Process Diagram High Pressure Coolant Injection System (4/20/2023)
- ML23129A472 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E727BB, Recirculation Flow Control System, Sheet 1 (4/20/2023)
- ML23129A424 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E727BB, Sheet 2, Functional Control Diagram Recirculation Flow Control System (4/20/2023)
- ML23129A493 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E727BB, Rev. 2, Sheet 3, Functional Control Diagram Recirculation Flow Control System (4/20/2023)
- ML23129A454 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 729E989, Power Range Monitoring Unit, Sheet 1 (4/20/2023)
- ML23129A458 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E100, Sheet 1, Neutron Monitoring System Arrangement General Plant Document (4/20/2023)
- ML23129A487 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E100, Neutron Monitoring, Sheet 2 (4/20/2023)
- ML23129A481 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 1, Functional Control Diagram Residual Heat Removal System (4/20/2023)
- ML23129A490 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E140BB, Revision N05, Sheet 2, FCD Residual Heat Removal System (4/20/2023)
- ML23129A460 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 3, Functional Control Diagram Residual Heat Removal System (4/20/2023)
- ML23129A476 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System (4/20/2023)
- ML23129A464 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E149BB, Sheet 1, Functional Control Diagram Nuclear Boiler (4/20/2023)
- ML23129A450 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E149BB, Sheet 2, functional Control Diagram Nuclear Boiler (Misc. System) (4/20/2023)
- ML23129A466 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E197BB, Rev. 7, Sheet 6b, Reactor Recirculation Controller Configuration (4/20/2023)
- ML23129A426 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E805BA, Rev. 1, Sheet 1, Functional Control Diagram Neutron Monitoring System (4/20/2023)
- ML23129A434 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E805BA, Revision 1, Sheet 6, Neutron Monitoring System Functional Control Diagram (4/20/2023)
- ML23129A485 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E805BA, Revision N01, Neutron Monitoring System Functional Control Diagram, Sheet 7 (4/20/2023)
- ML23129A459 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 730E923, Incore Startup Chamber Retract Mechanism (Field Installation) (4/20/2023)
- ML23129A473 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 731E611, Revision N04, Primary Steam Piping Nuclear Boiler Purchased Part, Sheet 1 (4/20/2023)
- ML23129A449 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 791E257, Revision N16, Sheet 3, Elementary Diagram Feedwater Control System (4/20/2023)
- ML23129A469 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 791E257, General Electric, Sheet 4 (4/20/2023)
- ML23129A447 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 80E1143, Revision N01, Fuel Storage Rack (4/20/2023)
- ML23129A431 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 80E1148, Fuel Storage Rack (13) And Seismic Bracing Installation In Pool (4/20/2023)
- ML23129A483 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3 (4/20/2023)
- ML23129A498 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 919D690BC, Reactor Vessel, Sheet 5 (4/20/2023)
- ML23129A463 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 920D225BB, Revision N03, Standby Liquid Control System Functional Control Diagram, Sheet 1 (4/20/2023)
- ML23129A422 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing 921D796, Rev. 2, Sheet 1, Functional Control Diagram Area Radiation Monitoring System (4/20/2023)
- ML23129A474 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing CNSMS43, Rev. 5, Leakage Paths from Outboard MSIV's (4/20/2023)
- ML23129A478 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing CNS-NBI-10, Revision N06, Reactor Water Level Indication Correlation (4/20/2023)
- ML23129A425 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing CP-001, CRD HS Diagram, Sheet 1 (4/20/2023)
- ML23129A446 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing DPPPG6002043800 B008247-980500, Upgraded HP, Heat Flow Diagram, Sheet 5, Withheld (4/20/2023)
- ML23129A445 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing IL-E-70-3, Area Temperature Monitoring System for Nuclear Boiler Systems Leak Detections, Sheet 107B (4/20/2023)
- ML23129A494 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107c, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection (4/20/2023)
- ML23129A457 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing ILE70-3, Installation Details - Temperature Detectors For Nuclear Boiler System Leak Detection, Sheet 107E (4/20/2023)
- ML23129A502 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection (4/20/2023)
- ML23129A461 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing NC29546, Transmission Line Routes (4/20/2023)
- ML23129A433 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing NC44587, Routing of 12.5 KV Underground System (4/20/2023)
- ML23129A462 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing SAA085, Sheet 4, 20 x 5 MSIV Actuator (4/20/2023)
- ML23129A442 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing SK101670R, Sheet 1 (4/20/2023)
- ML23129A440 - Cooper Nuclear Station, Revision 31 to Updated Safety Analysis Report, Drawing M200, Sheet 1, Containment Penetrations (4/20/2023)