The objective of this task was to provide instrumentation to monitor plant variables and systems during and following an accident. Indications of plant variables and status of systems important to safety are required by the plant operator (licensee) …
TASK III.D.1: RADIATION SOURCE CONTROL The objective of this task is to perform evaluations to establish additional design features that should be included in the rulemaking proceeding of Item II.B.8. The purpose of these evaluations is to identify design …
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
DESCRIPTION This NUREG-0471 [1] task involves the maintenance and improvement of calculational capabilities for assessing doses to individuals from radiation and radioactive effluents from normal operation and from radioactive releases from postulated …
DESCRIPTION Compilation of occupational radiation exposure reports from operating reactors has shown that exposures to station and contractor personnel have generally been increasing over the past 7 years for both PWRs and BWRs. The overriding problem at …
DESCRIPTION This NUREG-0471 [1] task involves evaluating information from semiannual operating reports, inplant measurements program and topical reports, and revisions to models for calculating releases of radioactive materials in effluents from PWRs and …
DESCRIPTION Practice in health impact assessments at the time of identification of this issue was to convert radiation exposure estimates into estimates of health effects, such as cancer deaths, illness, and life shortening. However, the models that were …
DESCRIPTION Historical Background This issue is identified in Appendix D of NUREG-0572 [1] and is one of the key observations made after the ACRS requested its members and consultants to make comprehensive reviews of all Licensee Event Reports (LERs) …
DESCRIPTION The issue, as originally proposed, [1] addressed the concern for fission product removal by the containment sprays and suppression pools in PWRs and BWRs, respectively; however, it was expanded to include PWR plants that use ice condenser …
DESCRIPTION Historical Background This issue was identified [1] by NRR as a result of a diagnostic evaluation team inspection of the SWS at Zion, a multiplant site. The inspection identified the potential for some additional shared systems to have an …
DESCRIPTION Historical Background A generic BWR power uprate program was created to provide a consistent means for individual licensees to recover additional generating capacity beyond their existing licensed limit. In 1990, GE submitted licensing topical …

Page Last Reviewed/Updated 3/1/2026

Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.