The objective of this task was to provide instrumentation to monitor plant variables and systems during and following an accident. Indications of plant variables and status of systems important to safety are required by the plant operator (licensee) …
TASK III.A.1: IMPROVE LICENSEE EMERGENCY PREPAREDNESS - SHORT-TERM The objectives of this task were to improve and upgrade licensee emergency preparedness by requiring improvements in facilities, plans, procedures, offsite support, technical assistance, …
The objective of this task was to upgrade the emergency preparedness of nuclear power plants. Specific criteria to meet this objective were delineated in NUREG-0654. [1] ITEM III.A.2.1: AMEND 10 CFR 50 AND 10 CFR 50, APPENDIX E The four parts of this item …
The objective of this task is to enable NRC, in the event of a nuclear accident at a licensed reactor facility, to: (1) monitor and evaluate the situation and potential hazards, (2) advise the licensee's operating staff as needed, and (3) in an extreme …
The objective of this task is to upgrade the state of emergency preparedness of State and local governments affected by nuclear facilities. The Federal Emergency Management Agency was given the lead on this effort by the President on December 7, 1979. …
The objectives of this task are: (1) to have information available for the news media and the public describing how nuclear plants operate, radiation and its health effects, and protective actions against radiation; and (2) to provide training for members …
DESCRIPTION Historical Background Operation of a LWR results in slow corrosion of the interior metal surfaces of the primary coolant system. The resulting corrosion products circulate through the reactor core and are activated by neutron flux from the …
DESCRIPTION This NUREG-0471 [1] task involved the preparation of a paper detailing the bases for design basis flood events utilized by the staff in case reviews, including probable maximum floods, hurricanes, tsunamis, seiches, seismically-induced dam …
DESCRIPTION Historical Background This issue, as originally stated in 1978, [1] addressed the unavailability (at that time) of a suitable model to predict the erosion rates and, therefore, the flood hydrographs at nuclear power plant sites resulting from …
DESCRIPTION Present NRC actions taken in response to a serious incident are directed from an Incident Response Center (IRC). To implement an adequate response, it is necessary that the IRC be equipped with appropriate communications services, information …
DESCRIPTION Historical Background On April 7, 1980, Arkansas Nuclear One (ANO) Units 1 and 2 experienced a significant event resulting from a loss of offsite power. Although both units were safely shut down, the analysis and evaluation of the event …
DESCRIPTION Historical Background The containment flooding issue stems from a flooding event that occurred at the Indian Point 2 reactor in October 1980. [1] A large quantity of water leaked from fan coolers onto the containment building floor and …
DESCRIPTION Historical Background This issue was raised [1] by DSI/NRR in August 1982 [2] following a search of LERs which suggested that additional licensing attention was needed for certain ancillary power plant equipment. The available information …
DESCRIPTION Historical Background On November 11, 1981, the DAILY REPORT-REGION I carried a "prompt report" from Calvert Cliffs Units 1 and 2 indicating the licensee had been notified that the water tight integrity of the service water pump rooms in both …
DESCRIPTION Historical Background This issue was initiated to address concerns raised by the Union of Concerned Scientists. (References [1] , [2] , and [3] .) The purposes for including this issue as a generic issue are to: (1) provide brief background …
DESCRIPTION Historical Background The issue of using the most recent NOAA procedures for determining probable maximum precipitation (PMP) was raised [1] after an OL applicant disputed the NRC use of NOAA Hydrometeorological Report (HMR) Nos. 51 [2] and …
DESCRIPTION In the prioritization of Issue 22, "Inadvertent Boron Dilution," it was found that inadvertent boron dilution events during cold shutdown operation do not constitute a significant risk to the public. Further work by DSI confirmed this …
DESCRIPTION Historical Background Combustible gases such as H 2 , propane, and acetylene are used during normal operations of nuclear power plants in limited quantities and for relatively short periods of time. H 2 , the most prevalent of these gases in …
DESCRIPTION In December 1984, the staff recommended in SECY-83-357B [1] that rulemaking with regard to H 2 control for LWRs with large, dry containments could be safely deferred due to the greater inherent capability of these containments to accommodate …
DESCRIPTION Historical Background This issue was identified by NRR/EIB in February 1986 when it was suggested that Issue 106, "Piping and the Use of Highly Combustible Gases in Vital Areas," be expanded to include new safety concerns associated with the …
DESCRIPTION Historical Background Issue 106 was resolved with the issuance of Generic Letter 93-06, "Research Results on Generic Safety Issue 106, Piping and the Use of Highly Combustible Gases in Vital Areas," dated October 25, 1993, [1] which included …
DESCRIPTION On August 24, 1992, Hurricane Andrew hit south Florida and caused extensive onsite and offsite damage at Turkey Point. Following this hurricane which was classified Category 4, an NRC/industry team was organized to: (1) review the damage …
DESCRIPTION Historical Background The issue of potential hazards from combustible gases was raised [1] after two events involving hydrogen combustion occurred within 2 months in late-2001 at two foreign BWRs. Both these events involved sudden rupture of …
DESCRIPTION Historical Background This issue was raised [1] , [2] by an NMSS staff member whose concern arose from the observation that spent fuel pool racks using Boral for neutron absorption had experienced some problems with swelling and degradation of …
DESCRIPTION Historical Background This issue was initiated [1] in response to a recommendation in the screening analysis of Generic Issue (A)             I-195, "Potential Hydrogen Combustion in BWR Piping." GI-195 investigated the potential safety …