DESCRIPTION Historical Background This issue was identified [1] by NRR following a request from Region I to review GE SIL 477 which identified the possibility of early containment bypass in a BWR, if any one of the MSIVs inside containment should fail to …
DESCRIPTION Historical Background This issue was identified [1] by NRR following the issuance of NRC Information Notice (IN) 93-17 [2] which was based in part on a deficiency in the Surry Power Station emergency diesel generator (DG) loading. This …
In resolving GSIs over the years, the staff generally found it necessary to make assumptions and establish limitations on the scope of the issues. As a result of its review of the resolution of some GSIs, the ACRS expressed concerns that the assumptions …
DESCRIPTION On August 24, 1992, Hurricane Andrew hit south Florida and caused extensive onsite and offsite damage at Turkey Point. Following this hurricane which was classified Category 4, an NRC/industry team was organized to: (1) review the damage …
DESCRIPTION Historical Background This issue was identified when it was believed [1] that the validity of steam generator (SG) tube leak and rupture analyses could be affected by resonance vibrations in steam generator tubes during steam line break …
DESCRIPTION Historical Background This generic issue was proposed [1] in response to SECY-00-198 [2] which explored means of risk informing 10 CFR 50.44. As a part of this effort, the paper recommended that safety enhancements that have the potential to …
DESCRIPTION Historical Background This issue was raised [1] by NRR and addresses the adequacy of the calculations, testing, and acceptance criteria related to the creation of a vacuum in the reactor building of a BWR, following an engineered safeguards …
DESCRIPTION Historical Background This issue was identified [1] by NRR following an allegation that was submitted to the NRC in March 2006 that described a scenario in which a SBLOCA event in a PWR has progressed to the sump recirculation mode of core …
The Chernobyl accident, with its absence of effective containment, has focused attention on the strengths and performance limits of the substantial containments for U.S. LWRs. It has led to added recognition of the significance of ongoing work on the …