NUREG 0933

Displaying 1 - 25 of 86

The objective of this task was to demonstrate by testing and analysis that the relief and safety valves, block valves, and associated piping in the reactor coolant system (RCS) were qualified for the full range of operating and accident conditions; …
The objective of this task was to provide instrumentation to monitor plant variables and systems during and following an accident. Indications of plant variables and status of systems important to safety are required by the plant operator (licensee) …
The objective of this task was to increase the reliability and diversification of the electrical power supplies for certain safety-related equipment. ITEM II.G.1: POWER SUPPLIES FOR PRESSURIZER RELIEF VALVES, BLOCK VALVES, AND LEVEL INDICATORS DESCRIPTION …
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
DESCRIPTION Because of the remote possibility of failure of nuclear reactor pressure vessels designed to the ASME Boiler and Pressure Vessel Code, the design of nuclear facilities does not provide protection against reactor vessel failure. Prevention of …
DESCRIPTION At the time this issue was identified in NUREG-0371, [1] trends in the design of nuclear power plants showed an increase in the use of digital computer technology in safety-related instrumentation and control systems. The first application of …
DESCRIPTION CP applicants for which SERs were issued after July 1, 1974, were required by the NRC to qualify all safety- related equipment to IEEE 323. [1] From the time this standard was originated, the industry developed methods that were used to …
DESCRIPTION Historical Background The safety concern of this NUREG-0371 [1] item deals with the consideration of alternatives to the basic design of nuclear power plants with the emphasis primarily on reduction of the vulnerability of reactors to …
DESCRIPTION Historical Background This issue is documented in NUREG-0371 [1] and addresses the adequacy of safety-related DC power supplies which was questioned by a nuclear consultant in a letter to the ACRS in April 1977 (NUREG-0305, [2] Attachment B). …
DESCRIPTION This NUREG-0371 [1] item was initiated in order to develop criteria and guidelines to be used by applicants, licensees, and staff reviewers to support implementation of Regulatory Guide 1.97, [2] Revision 1. Such criteria and guidelines were …
DESCRIPTION Pipe cracking has occurred in the heat-affected zones of welds in primary system piping in BWRs since mid-1960. These cracks have occurred mainly in Type 304 stainless steel which is the type used in most operating BWRs. The major problem is …
DESCRIPTION Nuclear power plant instrumentation and control systems are composed of safety-related protection systems and non-safety-related control systems. The safety-related protection systems are designed to satisfy the General Design Criteria …
DESCRIPTION Historical Background SRP [1] Section 3.6, issued in 1975, addressed pipe breaks outside containment by combining limited design basis breaks for mechanistic protection with unlimited breaks for non-mechanistic protection. Prior to this, …
DESCRIPTION Applicants are required to provide confirmation of the adequacy of computer programs used in the structural analysis and design of piping systems and components. At the time this issue was identified, this consisted of applicants providing, …
DESCRIPTION Surface cracks have been discovered in control rod drive internal parts at some operating BWR plants. Although only observed to be localized in nature, this cracking, if propagated, could potentially affect the capability of the control rod …
DESCRIPTION GDC-53, "Provisions for Containment Testing and Inspection," requires in part that the reactor containment be designed to permit: (1) periodic inspection of all important areas, and (2) an appropriate surveillance program. 10 CFR 50, Appendix …
DESCRIPTION Historical Background The ACRS raised a concern that there is a need to develop criteria for vibration monitoring systems which could provide early warning of excessive vibration inside the reactor vessel. This item is documented in …
DESCRIPTION Historical Background This NUREG-0471 [1] item was developed because of concerns regarding the long-term capability of hermetically- sealed instruments and equipment which must function in postaccident environments. Certain classes of …
DESCRIPTION Combinations of fabrication, stress, and environmental conditions have resulted in isolated instances of stress corrosion cracking of low pressure Schedule 10 Type 304 stainless steel piping systems. Although these systems are not part of a …
DESCRIPTION Historical Background Structural damage to the primary system, including the reactor pressure vessel and internals, associated piping and steam generator tubing in PWRs, can be caused by vibrations of sufficient magnitude. These vibrations can …
DESCRIPTION This NUREG-0471 [1] item was an ACRS generic concern that initially addressed the common mode failure of identical components exposed to identical or nearly-identical conditions or environments. This concern was later expanded to include other …
DESCRIPTION Background This issue was identified [1] after a review of LERs involving the failure or degraded performance of essential equipment that resulted from the failure of protective devices such as fuses and circuit breakers. The affected systems …
DESCRIPTION Historical Background This issue is identified in Appendix D of NUREG-0572 [1] and is one of the key observations made after the ACRS requested its members and consultants to make comprehensive reviews of all LERs issued during the years 1976, …
DESCRIPTION Background Flow-induced vibrations caused by vortex shedding resulting from rapid area change, buffeting due to random flow turbulence, fluid structures interaction instability, leakage excitation, steady operation of positive displacement …
DESCRIPTION Historical Background This issue apparently originated as a DOR proposal and was discussed in SECY-80-325. [1] The issue as previously evaluated [2] is whether periodic replacement of the squib charges and circuit checks of the traveling …

Page Last Reviewed/Updated 3/1/2026

Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.