The objective of this task was to demonstrate by testing and analysis that the relief and safety valves, block valves, and associated piping in the reactor coolant system (RCS) were qualified for the full range of operating and accident conditions; …
1
The objectives of this task were to: (1) decrease reliance on the emergency core cooling system (ECCS) for events other than LOCAs; (2) ensure that the ECCS design basis reliability and performance were consistent with operational experience; (3) reach a …
1
The objective of this task was to improve the reliability and capability of nuclear power plant systems for removing decay heat and achieving safe shutdown conditions following transients and under post-accident conditions. ITEM II.E.3.1: RELIABILITY OF …
1
The objectives of this task were to perform systems reliability analyses and to effect changes in emergency operating procedures and operator training to improve the capability of plants to mitigate the consequences of the small-break LOCAs and …
1
DESCRIPTION The issue was raised after the occurrence of various incidents of water hammer that involved steam generator feedrings and piping, emergency core cooling systems, RHR systems, containment spray, service water, feedwater, and steam lines. The …
1
DESCRIPTION Because of the remote possibility of failure of nuclear reactor pressure vessels designed to the ASME Boiler and Pressure Vessel Code, the design of nuclear facilities does not provide protection against reactor vessel failure. Prevention of …
1
DESCRIPTION Historical Background Prior to May 1978, tests conducted by GE showed that the presence of steam and/or increased pressure in and above the upper core region of BWRs could adversely affect the distribution of flow from certain types of core …
1
DESCRIPTION Historical Background The Class 1E power sources provide the electric power for the plant systems that are essential to reactor shutdown, containment isolation, reactor core cooling, containment heat removal or are otherwise essential in …
1
DESCRIPTION Historical Background This issue is documented in NUREG-0371 [1] and addresses the adequacy of safety-related DC power supplies which was questioned by a nuclear consultant in a letter to the ACRS in April 1977 (NUREG-0305, [2] Attachment B). …
1
DESCRIPTION This issue was raised in NUREG-0371 [1] following a series of events at operating plants that involved the offsite power systems. These events indicated that the reliability of the preferred source of emergency power might have been less than …
1
DESCRIPTION Pipe cracking has occurred in the heat-affected zones of welds in primary system piping in BWRs since mid-1960. These cracks have occurred mainly in Type 304 stainless steel which is the type used in most operating BWRs. The major problem is …
1
DESCRIPTION The complete loss of AC electrical power to the essential and nonessential switchgear buses in a nuclear power plant is referred to as a "Station Blackout." Because many safety systems required for reactor core decay heat removal are dependent …
1
DESCRIPTION The design criteria and methods for the seismic qualification of mechanical and electrical equipment in nuclear power plants underwent significant changes during the course of the licensing of commercial nuclear power plants. Consequently, it …
1
DESCRIPTION Numerical reliability goals and methods of analysis have not been established by the NRC. The current basis for plant licensing continues to be NRC regulations which require, among other things, that the consequences of a LOCA be suitably …
1
DESCRIPTION Historical Background This NUREG-0471 [1] item concerned staff positions [2] BTP EISCB 18 and BTP RSB 6-11 which required physical locking out of electrical sources to specific MOVs in the ECCS. The existing staff positions established the …
1
DESCRIPTION Some prototype electrical penetration failures have occurred to date. In addition, failures of low voltage penetration modules have occurred at a licensed facility. It was originally postulated that failures of the low voltage penetration …
1
DESCRIPTION Historical Background SRP [1] Section 3.6, issued in 1975, addressed pipe breaks outside containment by combining limited design basis breaks for mechanistic protection with unlimited breaks for non-mechanistic protection. Prior to this, …
1
DESCRIPTION A number of applicants for operating licenses have been performing sump tests to demonstrate ECCS operability during the recirculation phase following a postulated loss-of-coolant accident. These tests have shown that vortex formation is not …
1
DESCRIPTION Most vendors, in the conduct of internal audits of emergency core cooling performance computer codes, discovered errors in coding and/or logic which had significant effects on the prediction results of approved models. This NUREG-0471 [1] task …
1
DESCRIPTION The seismic qualification of complex electrical and mechanical components has undergone rapid changes in the past several years. Revisions in industry standards (IEEE 344) have resulted in the need to audit the qualification programs of NSSS …
1
DESCRIPTION Applicants are required to provide confirmation of the adequacy of computer programs used in the structural analysis and design of piping systems and components. At the time this issue was identified, this consisted of applicants providing, …
1
DESCRIPTION NRC environmental information needs for licensing fall into the categories of: (1) detailed site-specific investigations at a preferred site, and (2) reconnaissance level information to support alternative site assessment and selection, …
1
DESCRIPTION The effects of entrainment on phytoplankton and zooplankton populations are often minimal and occasionally beneficial. Numerous studies of the effects of entrainment on plankton organisms, phytoplankton, and zooplankton have shown impacts to …
1
DESCRIPTION Surface cracks have been discovered in control rod drive internal parts at some operating BWR plants. Although only observed to be localized in nature, this cracking, if propagated, could potentially affect the capability of the control rod …
1
DESCRIPTION GDC-53, "Provisions for Containment Testing and Inspection," requires in part that the reactor containment be designed to permit: (1) periodic inspection of all important areas, and (2) an appropriate surveillance program. 10 CFR 50, Appendix …
1