The objective of this task was to demonstrate by testing and analysis that the relief and safety valves, block valves, and associated piping in the reactor coolant system (RCS) were qualified for the full range of operating and accident conditions; …
The objective of this task was to evaluate whether existing requirements for valve testing provided adequate assurance of performance under design conditions. ITEM II.E.6.1: TEST ADEQUACY STUDY DESCRIPTION Historical Background The purpose of this TMI …
The objective of this task was to provide instrumentation to monitor plant variables and systems during and following an accident. Indications of plant variables and status of systems important to safety are required by the plant operator (licensee) …
The objective of this task was to increase the reliability and diversification of the electrical power supplies for certain safety-related equipment. ITEM II.G.1: POWER SUPPLIES FOR PRESSURIZER RELIEF VALVES, BLOCK VALVES, AND LEVEL INDICATORS DESCRIPTION …
TASK III.A.1: IMPROVE LICENSEE EMERGENCY PREPAREDNESS - SHORT-TERM The objectives of this task were to improve and upgrade licensee emergency preparedness by requiring improvements in facilities, plans, procedures, offsite support, technical assistance, …
The objective of this task was to upgrade the emergency preparedness of nuclear power plants. Specific criteria to meet this objective were delineated in NUREG-0654. [1] ITEM III.A.2.1: AMEND 10 CFR 50 AND 10 CFR 50, APPENDIX E The four parts of this item …
The objective of this task is to enable NRC, in the event of a nuclear accident at a licensed reactor facility, to: (1) monitor and evaluate the situation and potential hazards, (2) advise the licensee's operating staff as needed, and (3) in an extreme …
The objective of this task is to upgrade the state of emergency preparedness of State and local governments affected by nuclear facilities. The Federal Emergency Management Agency was given the lead on this effort by the President on December 7, 1979. …
The objectives of this task are: (1) to have information available for the news media and the public describing how nuclear plants operate, radiation and its health effects, and protective actions against radiation; and (2) to provide training for members …
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
DESCRIPTION The issue was raised after the occurrence of various incidents of water hammer that involved steam generator feedrings and piping, emergency core cooling systems, RHR systems, containment spray, service water, feedwater, and steam lines. The …
DESCRIPTION At the time this issue was identified in NUREG-0371, [1] trends in the design of nuclear power plants showed an increase in the use of digital computer technology in safety-related instrumentation and control systems. The first application of …
DESCRIPTION CP applicants for which SERs were issued after July 1, 1974, were required by the NRC to qualify all safety- related equipment to IEEE 323. [1] From the time this standard was originated, the industry developed methods that were used to …
DESCRIPTION Historical Background This issue is documented in NUREG-0371 [1] and addresses the adequacy of safety-related DC power supplies which was questioned by a nuclear consultant in a letter to the ACRS in April 1977 (NUREG-0305, [2] Attachment B). …
DESCRIPTION This NUREG-0371 [1] item was initiated in order to develop criteria and guidelines to be used by applicants, licensees, and staff reviewers to support implementation of Regulatory Guide 1.97, [2] Revision 1. Such criteria and guidelines were …
DESCRIPTION Historical Background This issue deals with a concern for the availability of adequate recirculation cooling water following a LOCA when long-term recirculation of cooling water from the PWR containment sump, or the BWR RHR system suction …
DESCRIPTION Nuclear power plant instrumentation and control systems are composed of safety-related protection systems and non-safety-related control systems. The safety-related protection systems are designed to satisfy the General Design Criteria …
DESCRIPTION Historical Background This NUREG-0471 [1] item concerned staff positions [2] BTP EISCB 18 and BTP RSB 6-11 which required physical locking out of electrical sources to specific MOVs in the ECCS. The existing staff positions established the …
DESCRIPTION A number of applicants for operating licenses have been performing sump tests to demonstrate ECCS operability during the recirculation phase following a postulated loss-of-coolant accident. These tests have shown that vortex formation is not …
DESCRIPTION The BWR pressure relief system is designed to prevent overpressurization of the reactor coolant pressure boundary (RCPB) under the most severe abnormal operational transient: closure of the main steam line isolation valves (MSIVs) with failure …
DESCRIPTION Historical Background This NUREG-0471 [1] item, as presently formulated, involves the conduct of analytical and experimental work to determine whether or not destructive overspeeds could be attained and to determine if corrective actions are …
DESCRIPTION Offsite power system frequency decay, depending on the rate of decay, could provide an electrical brake on the reactor coolant pump motors that could slow the pumps faster than the assumed flywheel coastdown flow rates normally used in …
DESCRIPTION Present NRC actions taken in response to a serious incident are directed from an Incident Response Center (IRC). To implement an adequate response, it is necessary that the IRC be equipped with appropriate communications services, information …
DESCRIPTION Historical Background The ACRS raised a concern that there is a need to develop criteria for vibration monitoring systems which could provide early warning of excessive vibration inside the reactor vessel. This item is documented in …
DESCRIPTION Historical Background This NUREG-0471 [1] item was developed because of concerns regarding the long-term capability of hermetically- sealed instruments and equipment which must function in postaccident environments. Certain classes of …