NUREG 0933
Displaying 1 - 25 of 60
The objective of this task was to demonstrate by testing and analysis that the relief and safety valves, block valves, and associated piping in the reactor coolant system (RCS) were qualified for the full range of operating and accident conditions; …
1
The objective of this task was to evaluate whether existing requirements for valve testing provided adequate assurance of performance under design conditions. ITEM II.E.6.1: TEST ADEQUACY STUDY DESCRIPTION Historical Background The purpose of this TMI …
1
The objective of this task was to provide instrumentation to monitor plant variables and systems during and following an accident. Indications of plant variables and status of systems important to safety are required by the plant operator (licensee) …
1
The objective of this task was to increase the reliability and diversification of the electrical power supplies for certain safety-related equipment. ITEM II.G.1: POWER SUPPLIES FOR PRESSURIZER RELIEF VALVES, BLOCK VALVES, AND LEVEL INDICATORS DESCRIPTION …
1
TASK III.A.1: IMPROVE LICENSEE EMERGENCY PREPAREDNESS - SHORT-TERM The objectives of this task were to improve and upgrade licensee emergency preparedness by requiring improvements in facilities, plans, procedures, offsite support, technical assistance, …
1
The objective of this task was to upgrade the emergency preparedness of nuclear power plants. Specific criteria to meet this objective were delineated in NUREG-0654. [1] ITEM III.A.2.1: AMEND 10 CFR 50 AND 10 CFR 50, APPENDIX E The four parts of this item …
1
The objective of this task is to enable NRC, in the event of a nuclear accident at a licensed reactor facility, to: (1) monitor and evaluate the situation and potential hazards, (2) advise the licensee's operating staff as needed, and (3) in an extreme …
1
The objective of this task is to upgrade the state of emergency preparedness of State and local governments affected by nuclear facilities. The Federal Emergency Management Agency was given the lead on this effort by the President on December 7, 1979. …
1
The objectives of this task are: (1) to have information available for the news media and the public describing how nuclear plants operate, radiation and its health effects, and protective actions against radiation; and (2) to provide training for members …
1
TASK III.D.1: RADIATION SOURCE CONTROL The objective of this task is to perform evaluations to establish additional design features that should be included in the rulemaking proceeding of Item II.B.8. The purpose of these evaluations is to identify design …
1
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
1
DESCRIPTION The issue was raised after the occurrence of various incidents of water hammer that involved steam generator feedrings and piping, emergency core cooling systems, RHR systems, containment spray, service water, feedwater, and steam lines. The …
1
DESCRIPTION Historical Background This issue deals with a concern for the availability of adequate recirculation cooling water following a LOCA when long-term recirculation of cooling water from the PWR containment sump, or the BWR RHR system suction …
1
DESCRIPTION Historical Background This NUREG-0471 [1] item concerned staff positions [2] BTP EISCB 18 and BTP RSB 6-11 which required physical locking out of electrical sources to specific MOVs in the ECCS. The existing staff positions established the …
1
DESCRIPTION A number of applicants for operating licenses have been performing sump tests to demonstrate ECCS operability during the recirculation phase following a postulated loss-of-coolant accident. These tests have shown that vortex formation is not …
1
DESCRIPTION This NUREG-0471 [1] task involves the maintenance and improvement of calculational capabilities for assessing doses to individuals from radiation and radioactive effluents from normal operation and from radioactive releases from postulated …
1
DESCRIPTION Compilation of occupational radiation exposure reports from operating reactors has shown that exposures to station and contractor personnel have generally been increasing over the past 7 years for both PWRs and BWRs. The overriding problem at …
1
DESCRIPTION This NUREG-0471 [1] task involves evaluating information from semiannual operating reports, inplant measurements program and topical reports, and revisions to models for calculating releases of radioactive materials in effluents from PWRs and …
1
DESCRIPTION The BWR pressure relief system is designed to prevent overpressurization of the reactor coolant pressure boundary (RCPB) under the most severe abnormal operational transient: closure of the main steam line isolation valves (MSIVs) with failure …
1
DESCRIPTION Historical Background This NUREG-0471 [1] item, as presently formulated, involves the conduct of analytical and experimental work to determine whether or not destructive overspeeds could be attained and to determine if corrective actions are …
1
DESCRIPTION Offsite power system frequency decay, depending on the rate of decay, could provide an electrical brake on the reactor coolant pump motors that could slow the pumps faster than the assumed flywheel coastdown flow rates normally used in …
1
DESCRIPTION Present NRC actions taken in response to a serious incident are directed from an Incident Response Center (IRC). To implement an adequate response, it is necessary that the IRC be equipped with appropriate communications services, information …
1
DESCRIPTION Practice in health impact assessments at the time of identification of this issue was to convert radiation exposure estimates into estimates of health effects, such as cancer deaths, illness, and life shortening. However, the models that were …
1
DESCRIPTION Historical Background The operating experience of nuclear power plants indicates that a number of valves, valve operators, and pumps fail to operate as specified in the technical specifications either under testing conditions or when they are …
1
DESCRIPTION Historical Background This issue is identified in Appendix D of NUREG-0572 [1] and is one of the key observations made after the ACRS requested its members and consultants to make comprehensive reviews of all Licensee Event Reports (LERs) …