NUREG 0933
Displaying 1 - 25 of 31
The objective of this task was to enhance public safety and reduce individual and societal risk by developing and implementing a phased program to include, in safety reviews, consideration of core degradation and melting beyond the design basis. ITEM …
1
The objective of this task was to provide instrumentation to monitor plant variables and systems during and following an accident. Indications of plant variables and status of systems important to safety are required by the plant operator (licensee) …
1
TASK III.A.1: IMPROVE LICENSEE EMERGENCY PREPAREDNESS - SHORT-TERM The objectives of this task were to improve and upgrade licensee emergency preparedness by requiring improvements in facilities, plans, procedures, offsite support, technical assistance, …
1
The objective of this task was to upgrade the emergency preparedness of nuclear power plants. Specific criteria to meet this objective were delineated in NUREG-0654. [1] ITEM III.A.2.1: AMEND 10 CFR 50 AND 10 CFR 50, APPENDIX E The four parts of this item …
1
The objective of this task is to enable NRC, in the event of a nuclear accident at a licensed reactor facility, to: (1) monitor and evaluate the situation and potential hazards, (2) advise the licensee's operating staff as needed, and (3) in an extreme …
1
The objective of this task is to upgrade the state of emergency preparedness of State and local governments affected by nuclear facilities. The Federal Emergency Management Agency was given the lead on this effort by the President on December 7, 1979. …
1
The objectives of this task are: (1) to have information available for the news media and the public describing how nuclear plants operate, radiation and its health effects, and protective actions against radiation; and (2) to provide training for members …
1
TASK III.D.1: RADIATION SOURCE CONTROL The objective of this task is to perform evaluations to establish additional design features that should be included in the rulemaking proceeding of Item II.B.8. The purpose of these evaluations is to identify design …
1
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
1
The objective of this task is to improve nuclear power plant worker radiation protection to allow workers to take effective action to control the course and consequences of an accident, as well as to keep exposures as low as reasonably achievable (ALARA) …
1
The objective of this task is to respond to the President's request for NRC participation in the Radiation Policy Council. ITEM IV.H.1: NRC PARTICIPATION IN THE RADIATION POLICY COUNCIL DESCRIPTION The Radiation Policy Council, a policy coordinating body …
1
DESCRIPTION Historical Background Operation of a LWR results in slow corrosion of the interior metal surfaces of the primary coolant system. The resulting corrosion products circulate through the reactor core and are activated by neutron flux from the …
1
DESCRIPTION At the time this issue was identified in NUREG-0371, [1] compliance with NEPA required that alternatives to a proposed Federal action be considered, and that required alternatives be balanced against the base case in terms of their associated …
1
DESCRIPTION This NUREG-0471 [1] task will develop more reliable models and associated computer capability than currently available to the staff for assessing the radiological consequences of accidents that could result in the releases of radioactivity …
1
DESCRIPTION This NUREG-0471 [1] task involved the preparation of a paper detailing the bases for design basis flood events utilized by the staff in case reviews, including probable maximum floods, hurricanes, tsunamis, seiches, seismically-induced dam …
1
DESCRIPTION Historical Background This issue, as originally stated in 1978, [1] addressed the unavailability (at that time) of a suitable model to predict the erosion rates and, therefore, the flood hydrographs at nuclear power plant sites resulting from …
1
DESCRIPTION This NUREG-0471 [1] task involves the maintenance and improvement of calculational capabilities for assessing doses to individuals from radiation and radioactive effluents from normal operation and from radioactive releases from postulated …
1
DESCRIPTION Present NRC actions taken in response to a serious incident are directed from an Incident Response Center (IRC). To implement an adequate response, it is necessary that the IRC be equipped with appropriate communications services, information …
1
DESCRIPTION Practice in health impact assessments at the time of identification of this issue was to convert radiation exposure estimates into estimates of health effects, such as cancer deaths, illness, and life shortening. However, the models that were …
1
DESCRIPTION Historical Background On April 7, 1980, Arkansas Nuclear One (ANO) Units 1 and 2 experienced a significant event resulting from a loss of offsite power. Although both units were safely shut down, the analysis and evaluation of the event …
1
DESCRIPTION Historical Background The containment flooding issue stems from a flooding event that occurred at the Indian Point 2 reactor in October 1980. [1] A large quantity of water leaked from fan coolers onto the containment building floor and …
1
DESCRIPTION Historical Background On November 11, 1981, the DAILY REPORT-REGION I carried a "prompt report" from Calvert Cliffs Units 1 and 2 indicating the licensee had been notified that the water tight integrity of the service water pump rooms in both …
1
DESCRIPTION Historical Background This issue was initiated to address concerns raised by the Union of Concerned Scientists. (References [1] , [2] , and [3] .) The purposes for including this issue as a generic issue are to: (1) provide brief background …
1
DESCRIPTION Historical Background Over the past several years, the NRC staff has noted an unacceptably large number of overexposures and uncontrolled exposures associated with pressurized water reactor cavity entries while incore detectors were withdrawn. …
1
DESCRIPTION Historical Background The issue of using the most recent NOAA procedures for determining probable maximum precipitation (PMP) was raised [1] after an OL applicant disputed the NRC use of NOAA Hydrometeorological Report (HMR) Nos. 51 [2] and …
1
Page Last Reviewed/Updated 3/1/2026
Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.