NUREG 0933
Applied Filters
Displaying 1 - 25 of 38
The objective of this task was to enhance public safety and reduce individual and societal risk by developing and implementing a phased program to include, in safety reviews, consideration of core degradation and melting beyond the design basis. ITEM …
1
The objective of this task was to provide instrumentation to monitor plant variables and systems during and following an accident. Indications of plant variables and status of systems important to safety are required by the plant operator (licensee) …
1
TASK III.A.1: IMPROVE LICENSEE EMERGENCY PREPAREDNESS - SHORT-TERM The objectives of this task were to improve and upgrade licensee emergency preparedness by requiring improvements in facilities, plans, procedures, offsite support, technical assistance, …
1
The objective of this task was to upgrade the emergency preparedness of nuclear power plants. Specific criteria to meet this objective were delineated in NUREG-0654. [1] ITEM III.A.2.1: AMEND 10 CFR 50 AND 10 CFR 50, APPENDIX E The four parts of this item …
1
The objective of this task is to enable NRC, in the event of a nuclear accident at a licensed reactor facility, to: (1) monitor and evaluate the situation and potential hazards, (2) advise the licensee's operating staff as needed, and (3) in an extreme …
1
The objective of this task is to upgrade the state of emergency preparedness of State and local governments affected by nuclear facilities. The Federal Emergency Management Agency was given the lead on this effort by the President on December 7, 1979. …
1
The objectives of this task are: (1) to have information available for the news media and the public describing how nuclear plants operate, radiation and its health effects, and protective actions against radiation; and (2) to provide training for members …
1
TASK III.D.1: RADIATION SOURCE CONTROL The objective of this task is to perform evaluations to establish additional design features that should be included in the rulemaking proceeding of Item II.B.8. The purpose of these evaluations is to identify design …
1
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
1
The objective of this task is to improve nuclear power plant worker radiation protection to allow workers to take effective action to control the course and consequences of an accident, as well as to keep exposures as low as reasonably achievable (ALARA) …
1
The objective of this task is to respond to the President's request for NRC participation in the Radiation Policy Council. ITEM IV.H.1: NRC PARTICIPATION IN THE RADIATION POLICY COUNCIL DESCRIPTION The Radiation Policy Council, a policy coordinating body …
1
DESCRIPTION Historical Background Operation of a LWR results in slow corrosion of the interior metal surfaces of the primary coolant system. The resulting corrosion products circulate through the reactor core and are activated by neutron flux from the …
1
DESCRIPTION At the time this issue was identified in NUREG-0371, [1] compliance with NEPA required that alternatives to a proposed Federal action be considered, and that required alternatives be balanced against the base case in terms of their associated …
1
DESCRIPTION By letter dated June 18, 1975, licensees of operating reactor facilities were sent a preliminary copy of a staff paper, "Guidance for Proposed License Amendments Relating to Refueling," and "Refueling Information Request Form." The purpose was …
1
DESCRIPTION Historical Background This NUREG-0371 [1] item involves the development of consistent and formalized acceptance criteria regarding the conversion to higher density storage racks (increased storage capacity) in existing spent fuel storage …
1
DESCRIPTION This NUREG-0471 [1] task will develop more reliable models and associated computer capability than currently available to the staff for assessing the radiological consequences of accidents that could result in the releases of radioactivity …
1
DESCRIPTION Historical Background Individual reactor fuel rods sometimes fail during normal operations and many fuel rods are expected to fail during severe accidents. To ensure that these fuel failures do not result in unacceptable releases to the …
1
DESCRIPTION This NUREG-0471 [1] task covers a spectrum of technical efforts related to the staff review of LMFBR fuel designs. The efforts include: (1) evaluating licensing requirements for the behavior of stainless steel cladding and hexcans in an LMFBR …
1
DESCRIPTION This NUREG-0471 [1] task involves the maintenance and improvement of calculational capabilities for assessing doses to individuals from radiation and radioactive effluents from normal operation and from radioactive releases from postulated …
1
DESCRIPTION The fuel assembly is a highly nonlinear structure which can be subjected to substantial loadings during seismic excitations and LOCA transients. The integrity of this assembly is critical for plant safety. Extensive work has been completed by …
1
DESCRIPTION Present NRC actions taken in response to a serious incident are directed from an Incident Response Center (IRC). To implement an adequate response, it is necessary that the IRC be equipped with appropriate communications services, information …
1
DESCRIPTION Practice in health impact assessments at the time of identification of this issue was to convert radiation exposure estimates into estimates of health effects, such as cancer deaths, illness, and life shortening. However, the models that were …
1
DESCRIPTION BWRs are operated in such a manner as to attempt to produce an axial power distribution with as little peaking as possible. When the reactor moderator is not boiling (e.g., during startup and heatup), the axial flux distribution is much more …
1
DESCRIPTION Historical Background On April 7, 1980, Arkansas Nuclear One (ANO) Units 1 and 2 experienced a significant event resulting from a loss of offsite power. Although both units were safely shut down, the analysis and evaluation of the event …
1
DESCRIPTION Historical Background In response to a 1967 ACRS concern relative to the potential of melting and subsequent disintegration of a portion of a fuel assembly due to inlet orifice flow blockage, GE submitted NEDO-10174 [1] in May 1970. As a …
1
Page Last Reviewed/Updated 3/1/2026
Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.