The objective of this task was to enhance public safety and reduce individual and societal risk by developing and implementing a phased program to include, in safety reviews, consideration of core degradation and melting beyond the design basis. ITEM …
1
The objective of this task was to demonstrate by testing and analysis that the relief and safety valves, block valves, and associated piping in the reactor coolant system (RCS) were qualified for the full range of operating and accident conditions; …
1
The objective of this task was to improve the reliability and capability of nuclear power plant systems for removing decay heat and achieving safe shutdown conditions following transients and under post-accident conditions. ITEM II.E.3.1: RELIABILITY OF …
1
TASK III.D.1: RADIATION SOURCE CONTROL The objective of this task is to perform evaluations to establish additional design features that should be included in the rulemaking proceeding of Item II.B.8. The purpose of these evaluations is to identify design …
1
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
1
The objective of this task is to improve nuclear power plant worker radiation protection to allow workers to take effective action to control the course and consequences of an accident, as well as to keep exposures as low as reasonably achievable (ALARA) …
1
The objective of this task is to respond to the President's request for NRC participation in the Radiation Policy Council. ITEM IV.H.1: NRC PARTICIPATION IN THE RADIATION POLICY COUNCIL DESCRIPTION The Radiation Policy Council, a policy coordinating body …
1
DESCRIPTION Because of the remote possibility of failure of nuclear reactor pressure vessels designed to the ASME Boiler and Pressure Vessel Code, the design of nuclear facilities does not provide protection against reactor vessel failure. Prevention of …
1
DESCRIPTION Historical Background Operation of a LWR results in slow corrosion of the interior metal surfaces of the primary coolant system. The resulting corrosion products circulate through the reactor core and are activated by neutron flux from the …
1
DESCRIPTION At the time this issue was identified in NUREG-0371, [1] compliance with NEPA required that alternatives to a proposed Federal action be considered, and that required alternatives be balanced against the base case in terms of their associated …
1
DESCRIPTION Historical Background The Class 1E power sources provide the electric power for the plant systems that are essential to reactor shutdown, containment isolation, reactor core cooling, containment heat removal or are otherwise essential in …
1
DESCRIPTION Historical Background This issue is documented in NUREG-0371 [1] and addresses the adequacy of safety-related DC power supplies which was questioned by a nuclear consultant in a letter to the ACRS in April 1977 (NUREG-0305, [2] Attachment B). …
1
DESCRIPTION This issue was raised in NUREG-0371 [1] following a series of events at operating plants that involved the offsite power systems. These events indicated that the reliability of the preferred source of emergency power might have been less than …
1
DESCRIPTION Pipe cracking has occurred in the heat-affected zones of welds in primary system piping in BWRs since mid-1960. These cracks have occurred mainly in Type 304 stainless steel which is the type used in most operating BWRs. The major problem is …
1
DESCRIPTION The complete loss of AC electrical power to the essential and nonessential switchgear buses in a nuclear power plant is referred to as a "Station Blackout." Because many safety systems required for reactor core decay heat removal are dependent …
1
DESCRIPTION The design criteria and methods for the seismic qualification of mechanical and electrical equipment in nuclear power plants underwent significant changes during the course of the licensing of commercial nuclear power plants. Consequently, it …
1
DESCRIPTION This NUREG-0471 [1] task will develop more reliable models and associated computer capability than currently available to the staff for assessing the radiological consequences of accidents that could result in the releases of radioactivity …
1
DESCRIPTION Some prototype electrical penetration failures have occurred to date. In addition, failures of low voltage penetration modules have occurred at a licensed facility. It was originally postulated that failures of the low voltage penetration …
1
DESCRIPTION Historical Background SRP [1] Section 3.6, issued in 1975, addressed pipe breaks outside containment by combining limited design basis breaks for mechanistic protection with unlimited breaks for non-mechanistic protection. Prior to this, …
1
DESCRIPTION The seismic qualification of complex electrical and mechanical components has undergone rapid changes in the past several years. Revisions in industry standards (IEEE 344) have resulted in the need to audit the qualification programs of NSSS …
1
DESCRIPTION Applicants are required to provide confirmation of the adequacy of computer programs used in the structural analysis and design of piping systems and components. At the time this issue was identified, this consisted of applicants providing, …
1
DESCRIPTION This NUREG-0471 [1] task involves the maintenance and improvement of calculational capabilities for assessing doses to individuals from radiation and radioactive effluents from normal operation and from radioactive releases from postulated …
1
DESCRIPTION NRC environmental information needs for licensing fall into the categories of: (1) detailed site-specific investigations at a preferred site, and (2) reconnaissance level information to support alternative site assessment and selection, …
1
DESCRIPTION The effects of entrainment on phytoplankton and zooplankton populations are often minimal and occasionally beneficial. Numerous studies of the effects of entrainment on plankton organisms, phytoplankton, and zooplankton have shown impacts to …
1
DESCRIPTION Surface cracks have been discovered in control rod drive internal parts at some operating BWR plants. Although only observed to be localized in nature, this cracking, if propagated, could potentially affect the capability of the control rod …