The objective of this task was to improve the quality assurance program (QA) for design, construction, and operations to provide greater assurance that plant design, construction, and operational activities were conducted in a manner commensurate with …
The objective of this task was to provide instrumentation to monitor plant variables and systems during and following an accident. Indications of plant variables and status of systems important to safety are required by the plant operator (licensee) …
The objective of this task was to increase the reliability and diversification of the electrical power supplies for certain safety-related equipment. ITEM II.G.1: POWER SUPPLIES FOR PRESSURIZER RELIEF VALVES, BLOCK VALVES, AND LEVEL INDICATORS DESCRIPTION …
TASK II.J.1: VENDOR INSPECTION PROGRAM The objective of this task was to improve vendor-supplied components and services through a modified and more effective vendor inspection program. ITEM II.J.1.1: ESTABLISH A PRIORITY SYSTEM FOR CONDUCTING VENDOR …
The objective of this task was to improve the qualification of licensees for operating nuclear power plants by requiring greater oversight of design, construction, and modification activities. ITEM II.J.3.1: ORGANIZATION AND STAFFING TO OVERSEE DESIGN AND …
The objective of this task was to clarify deficiency report requirements to obtain uniform reporting and earlier identification and correction of problems. ITEM II.J.4.1: REVISE DEFICIENCY REPORTING REQUIREMENTS DESCRIPTION This TMI Action Plan [1] item …
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
DESCRIPTION At the time this issue was identified in NUREG-0371, [1] trends in the design of nuclear power plants showed an increase in the use of digital computer technology in safety-related instrumentation and control systems. The first application of …
DESCRIPTION CP applicants for which SERs were issued after July 1, 1974, were required by the NRC to qualify all safety- related equipment to IEEE 323. [1] From the time this standard was originated, the industry developed methods that were used to …
DESCRIPTION Historical Background This issue is documented in NUREG-0371 [1] and addresses the adequacy of safety-related DC power supplies which was questioned by a nuclear consultant in a letter to the ACRS in April 1977 (NUREG-0305, [2] Attachment B). …
DESCRIPTION This NUREG-0371 [1] item was initiated in order to develop criteria and guidelines to be used by applicants, licensees, and staff reviewers to support implementation of Regulatory Guide 1.97, [2] Revision 1. Such criteria and guidelines were …
DESCRIPTION Nuclear power plant instrumentation and control systems are composed of safety-related protection systems and non-safety-related control systems. The safety-related protection systems are designed to satisfy the General Design Criteria …
DESCRIPTION This NUREG-0471 [1] task involved the preparation of a paper detailing the bases for design basis flood events utilized by the staff in case reviews, including probable maximum floods, hurricanes, tsunamis, seiches, seismically-induced dam …
DESCRIPTION Historical Background This issue, as originally stated in 1978, [1] addressed the unavailability (at that time) of a suitable model to predict the erosion rates and, therefore, the flood hydrographs at nuclear power plant sites resulting from …
DESCRIPTION Historical Background The ACRS raised a concern that there is a need to develop criteria for vibration monitoring systems which could provide early warning of excessive vibration inside the reactor vessel. This item is documented in …
DESCRIPTION Historical Background This NUREG-0471 [1] item was developed because of concerns regarding the long-term capability of hermetically- sealed instruments and equipment which must function in postaccident environments. Certain classes of …
DESCRIPTION This NUREG-0471 [1] item was an ACRS generic concern that initially addressed the common mode failure of identical components exposed to identical or nearly-identical conditions or environments. This concern was later expanded to include other …
DESCRIPTION Background This issue was identified [1] after a review of LERs involving the failure or degraded performance of essential equipment that resulted from the failure of protective devices such as fuses and circuit breakers. The affected systems …
DESCRIPTION Historical Background This issue is identified in Appendix D of NUREG-0572 [1] and is one of the key observations made after the ACRS requested its members and consultants to make comprehensive reviews of all LERs issued during the years 1976, …
DESCRIPTION The concern of this issue involves the requirement for verification that the balance-of-plant equipment satisfies the design intent. This issue was identified in NUREG-0705. [1] CONCLUSION Task I.F in NUREG-0660, [2] the TMI Action Plan, is a …
DESCRIPTION Historical Background Cracking has occurred in PWR piping systems as a result of stress corrosion, vibratory and thermal fatigue, and dynamic loading. However, as of February 1981, no cracking had been experienced in the primary system piping …
DESCRIPTION Historical Background In the event of a LOCA in which offsite power remains available, the reactor operator may choose to shut down the emergency diesel generators shortly after the LOCA. If, after the diesels are shut down, offsite power is …
DESCRIPTION On November 10, 1979, an event occurred at the Oconee Power Station, Unit 3, that resulted in loss of power to a non-Class 1E 120-volt AC single-phase power panel that supplied power to the integrated control system (ICS) and the nonnuclear …
DESCRIPTION Historical Background This concern was raised [1] because of the potential for a high-altitude nuclear weapon detonation causing a large electromagnetic pulse (EMP) which subsequently could induce large currents and voltages in electrical …
DESCRIPTION This issue concerns the slow loss of control air pressure in the scram system of BWRs. [1] Air pressure dropping at a certain rate will first allow some of the CRD scram outlet valves to open slightly, thus filling the scram discharge volume …

Page Last Reviewed/Updated 3/1/2026