NUREG 0933
Displaying 1 - 25 of 82
TASK I.A.1: OPERATING PERSONNEL AND STAFFING Complex transients in nuclear power plants place high demands on the operators in the control room. The objective of the actions described in this task was to increase the capability of the shift crews in the …
1
The objectives of this task were to: (1) improve the capability of operators and supervisors to understand and control complex reactor transients and accidents; (2) improve the general capability of an operations organization to respond rapidly and …
1
The objectives of this task were to: (1) upgrade the requirements and procedures for nuclear power plants operator and supervisor licensing to assure that safe and competent operators and senior operators are I charge of the day-to-day operation of …
1
The objectives of this task were to: (1) establish and sustain a high level of realism in the training and retraining of operators, including dealing with complex transients involving multiple permutations and combinations of failures and errors; and (2) …
1
The objectives of this task were to: (1) Improve licensee safety performance and ability to respond to accidents by upgrading the licensee groups responsible for radiation protection and plant operation in such areas as staff size; education and …
1
The objective of this task was to improve the quality of procedures to provide greater assurance that operator and staff actions were technically correct, explicit, and easily understood for normal, transient, and accident conditions. The overall content, …
1
The objective of this task was to improve the ability of nuclear power plant control room operators to prevent accidents or cope with accidents if they occur by improving the information provided to them. ITEM I.D.1: CONTROL ROOM DESIGN REVIEWS This item …
1
The objectives of this task were to: (1) increase the capability of shift crews to operate facilities in a safe and competent manner by assuring that training for plant changes and off-normal events was conducted; and (2) review the comprehensiveness of …
1
The objective of this task was to improve the reliability and capability of nuclear power plant systems for removing decay heat and achieving safe shutdown conditions following transients and under post-accident conditions. ITEM II.E.3.1: RELIABILITY OF …
1
The objectives of this task were to perform systems reliability analyses and to effect changes in emergency operating procedures and operator training to improve the capability of plants to mitigate the consequences of the small-break LOCAs and …
1
The objectives of this task are: (1) to improve and expand the NRC training program for the technical staff and resident inspectors, including, where appropriate, hands-on training; and (2) to establish a program to provide technically qualified …
1
DESCRIPTION The issue was raised after the occurrence of various incidents of water hammer that involved steam generator feedrings and piping, emergency core cooling systems, RHR systems, containment spray, service water, feedwater, and steam lines. The …
1
DESCRIPTION Inspections of operating BWRs conducted up to April 1978 revealed cracks in the feedwater nozzles of 20 reactor vessels. Most of these BWRs contained 4 nozzles with diameters ranging from 10 in. to 12 in. Although most cracks ranged from 1/2 …
1
DESCRIPTION Because of the remote possibility of failure of nuclear reactor pressure vessels designed to the ASME Boiler and Pressure Vessel Code, the design of nuclear facilities does not provide protection against reactor vessel failure. Prevention of …
1
DESCRIPTION Historical Background In May 1978, the ACRS and the staff expressed concern over the substantial number of LERs related to the malfunction of snubbers, the most frequent of which were: (1) seal leakage in hydraulic snubbers; and (2) high …
1
DESCRIPTION At all nuclear plants, overhead cranes are used to lift heavy objects in the vicinity of spent fuel. If a heavy object such as a spent fuel shipping cask or shielding block were to fall onto spent fuel in the storage pool or reactor core …
1
DESCRIPTION Historical Background The AEC first established missile-protection requirements in 1967. GDC-2 and GDC-4 of 10 CFR Part 50, Appendix A, require in part that structures, systems, and components important to safety be designed to be able to …
1
DESCRIPTION Structures, systems, and components important to the safety of nuclear power plants are required to withstand the effects of natural phenomena such as earthquakes. Broad requirements for earthquake resistance are specified in 10 CFR Parts 50 …
1
DESCRIPTION Historical Background In a memorandum [1] dated June 7, 1976, NRR recommended that a study be initiated on the quantification of inherent seismic safety margins in NRR's seismic design requirements. This memo suggested the initiation of a …
1
DESCRIPTION The design criteria and methods for the seismic qualification of mechanical and electrical equipment in nuclear power plants underwent significant changes during the course of the licensing of commercial nuclear power plants. Consequently, it …
1
DESCRIPTION Neutron irradiation of reactor pressure vessel weld and plate materials decreases the fracture toughness of the materials. The fracture toughness sensitivity to radiation-induced change is increased by the presence of certain materials such as …
1
This item has been divided into two parts which have been evaluated separately. PART I - Ductility of Two-Way Slabs and Shells DESCRIPTION Historical Background This issue was identified in NUREG-0471 [1] and involved concern over the lack of information …
1
DESCRIPTION Historical Background This issue was identified as a generic problem in NUREG-0471 [1] and concerns the design of pressure vessels and piping systems components which must be designed to accommodate individual and combined loads due to normal …
1
DESCRIPTION Historical Background This NUREG-0471 [1] item involved the development of a time criterion for safety-related operator actions (SROA), including a determination of whether or not automatic actuation was to be required. At the time this issue …
1
DESCRIPTION Applicants are required to provide confirmation of the adequacy of computer programs used in the structural analysis and design of piping systems and components. At the time this issue was identified, this consisted of applicants providing, …
1
Page Last Reviewed/Updated 3/1/2026
Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.