TASK I.A.1: OPERATING PERSONNEL AND STAFFING Complex transients in nuclear power plants place high demands on the operators in the control room. The objective of the actions described in this task was to increase the capability of the shift crews in the …
The objectives of this task were to: (1) improve the capability of operators and supervisors to understand and control complex reactor transients and accidents; (2) improve the general capability of an operations organization to respond rapidly and …
The objectives of this task were to: (1) upgrade the requirements and procedures for nuclear power plants operator and supervisor licensing to assure that safe and competent operators and senior operators are I charge of the day-to-day operation of …
The objectives of this task were to: (1) establish and sustain a high level of realism in the training and retraining of operators, including dealing with complex transients involving multiple permutations and combinations of failures and errors; and (2) …
The objectives of this task were to: (1)   Improve licensee safety performance and ability to respond to accidents by upgrading the licensee groups responsible for radiation protection and plant operation in such areas as staff size; education and …
The objective of this task was to improve the quality of procedures to provide greater assurance that operator and staff actions were technically correct, explicit, and easily understood for normal, transient, and accident conditions. The overall content, …
The objective of this task was to improve the ability of nuclear power plant control room operators to prevent accidents or cope with accidents if they occur by improving the information provided to them. ITEM I.D.1: CONTROL ROOM DESIGN REVIEWS This item …
The objectives of this task were to: (1) increase the capability of shift crews to operate facilities in a safe and competent manner by assuring that training for plant changes and off-normal events was conducted; and (2) review the comprehensiveness of …
The objective of this task was to improve the reliability and capability of nuclear power plant systems for removing decay heat and achieving safe shutdown conditions following transients and under post-accident conditions. ITEM II.E.3.1: RELIABILITY OF …
The objectives of this task were to perform systems reliability analyses and to effect changes in emergency operating procedures and operator training to improve the capability of plants to mitigate the consequences of the small-break LOCAs and …
The objectives of this task are: (1) to improve and expand the NRC training program for the technical staff and resident inspectors, including, where appropriate, hands-on training; and (2) to establish a program to provide technically qualified …
DESCRIPTION Historical Background Operation of a LWR results in slow corrosion of the interior metal surfaces of the primary coolant system. The resulting corrosion products circulate through the reactor core and are activated by neutron flux from the …
DESCRIPTION Historical Background The Class 1E power sources provide the electric power for the plant systems that are essential to reactor shutdown, containment isolation, reactor core cooling, containment heat removal or are otherwise essential in …
DESCRIPTION Historical Background This issue is documented in NUREG-0371 [1] and addresses the adequacy of safety-related DC power supplies which was questioned by a nuclear consultant in a letter to the ACRS in April 1977 (NUREG-0305, [2] Attachment B). …
DESCRIPTION This issue was raised in NUREG-0371 [1] following a series of events at operating plants that involved the offsite power systems. These events indicated that the reliability of the preferred source of emergency power might have been less than …
DESCRIPTION The complete loss of AC electrical power to the essential and nonessential switchgear buses in a nuclear power plant is referred to as a "Station Blackout." Because many safety systems required for reactor core decay heat removal are dependent …
DESCRIPTION The design criteria and methods for the seismic qualification of mechanical and electrical equipment in nuclear power plants underwent significant changes during the course of the licensing of commercial nuclear power plants. Consequently, it …
DESCRIPTION Some prototype electrical penetration failures have occurred to date. In addition, failures of low voltage penetration modules have occurred at a licensed facility. It was originally postulated that failures of the low voltage penetration …
DESCRIPTION Historical Background This NUREG-0471 [1] item involved the development of a time criterion for safety-related operator actions (SROA), including a determination of whether or not automatic actuation was to be required. At the time this issue …
DESCRIPTION The seismic qualification of complex electrical and mechanical components has undergone rapid changes in the past several years. Revisions in industry standards (IEEE 344) have resulted in the need to audit the qualification programs of NSSS …
DESCRIPTION NRC environmental information needs for licensing fall into the categories of: (1) detailed site-specific investigations at a preferred site, and (2) reconnaissance level information to support alternative site assessment and selection, …
DESCRIPTION The effects of entrainment on phytoplankton and zooplankton populations are often minimal and occasionally beneficial. Numerous studies of the effects of entrainment on plankton organisms, phytoplankton, and zooplankton have shown impacts to …
DESCRIPTION Historical Background This NUREG-0471 [1] item arose in the course of the NRC review of the McGuire application, where the applicant proposed relying on the generator load break switch for isolating the generator from the stepup transformer …
DESCRIPTION Historical Background This issue was documented in NUREG-0471 [1] and resulted from a review of LERs which indicated that onsite emergency diesel generators (EDGs) at operating plants were demonstrating an average starting reliability of about …
DESCRIPTION This NUREG-0471 [1] task will make a determination as to whether plants should be designed to accommodate a total loss of all AC power for a limited period of time. CONCLUSION This issue is covered in USI A-44, "Station Blackout."     [1] …