DESCRIPTION Historical Background This issue was identified during the staff review of the Indian Point 2 and Zion PRAs [1] ; in both of these studies, the dominant interfacing systems LOCA events were estimated to be through the RHR suction valves. The …
DESCRIPTION Historical Background During the review of LaSalle, ASB identified a potential problem which could be generic to all BWRs. [1] [2] The problem relates to ability of the CRD accumulators to retain pressure for a sufficient period of time after …
DESCRIPTION Historical Background On April 17, 1984, a DSI memorandum [1] on the subject of RHR interlocks for W plants described staff concerns that the design basis for RHR interlocks had been misunderstood and that these concerns had not been …
DESCRIPTION Historical Background Issue 50 addressed several areas of concern with BWR water level instrumentation and its resolution involved voluntary implementation of water level measurement improvements for all of the staff concerns, except the one …
DESCRIPTION Historical Background In January 1984, AEOD issued a special study report (AEOD/S401) [1] describing the number of events that resulted from human error in identification of the correct unit or train. This study focused on LERs issued during …
DESCRIPTION Historical Background Issue B-63, which was resolved and implemented as MPA B-45, required leak-testing of the check valves that isolate those low pressure systems that are connected to the RCS outside the containment. However, except for …
DESCRIPTION Historical Background This issue was identified in a DST/NRR memorandum [1] which addressed a condition in which some protective devices intended to trip active engineered safety features (ESF) components, under indication of equipment …
DESCRIPTION Historical Background This issue was identified in a NRR/DST memorandum [1] and addressed the potential risk reduction that might result from training operators and having procedures developed to assist the operators in managing accidents …
DESCRIPTION The loss of all feedwater event at Davis-Besse on June 9, 1985, resulted in the formation of an NRC project team to investigate the event. The team's findings were published in NUREG-1154 [1] and were subsequently reviewed by DL/NRR. As a …
DESCRIPTION In 1985, operating experience as well as staff and industry studies indicated that AFW systems continued to fail at a high rate. These studies also indicated that plants with similar AFW system reliabilities (as calculated in accordance with …
On June 9, 1985, Davis-Besse had a partial loss of feedwater while operating at 90% power. Following a reactor trip, the loss of all feedwater occurred. The two OTSGs became dry and were ineffective as a heat sink. Consequently, the RCS pressure increased …
DESCRIPTION Background The reliability of PWR main steam safety valves (MSSVs) was identified as a generic issue in a DSRO memorandum on March 1986 [1] in which it was noted that individual PWR plant FSARs assume credit for MSSV functional capability to …
DESCRIPTION Historical Background This issue was identified in a May 1986 DSI memorandum [1] in which 21 instances of BWR vessel draining through various paths in the RHR system piping were described. Later, in August 1986, AEOD/E609 [2] was issued …
DESCRIPTION Historical Background In IE Circular No. 80-02, [1] the concern of overtime work for licensee staff who perform safety-related functions was discussed and limits on maximum working hours were recommended. In July 1980, a letter [2] was issued …
DESCRIPTION Since the TMI-2 accident in March 1979, to which human error was a major contributor, the issue of academic requirements for reactor operators has been a major concern of the NRC. In October 1985, the NRC issued a Policy Statement on …
DESCRIPTION Historical Background This issue was identified as an alternative approach to the Finding 15 recommendation [1] discussed in Issue 125.I.5, "Safety Systems Tested in All Conditions Required by DBA," which states that "[t]horough integrated …
DESCRIPTION Historical Background This issue was identified [1] by DSIR/RES following ACRS concerns raised during the review of the resolution of Issue 87, "Failure of HPCI Steam Line Without Isolation," which addressed the design bases for those MOVs …
DESCRIPTION Historical Background The reliability of essential service water (ESW) systems and related problems have been an ongoing staff concern which has been documented in NUREG/CR-2797, [1] IE Bulletins 80-24 [2] and 81-03, [3] Generic Letter No. …
DESCRIPTION Historical Background This issue arose as the result of an event at the Palo Verde Nuclear Generating Station (PVNGS) Unit 3 in which inadequate lighting conditions exacerbated an unrelated reactor trip. [1] During this event, half of the …
DESCRIPTION Historical Background This issue was identified [1] by NRR after reactor operating experience and research results on MOVs, SOVs, AOVs, and HOVs indicated that testing under static conditions did not always reveal how these valves would …
DESCRIPTION Historical Background This issue was identified [1] by NRR and addressed concerns involving centrifugal pumps operating at some point below the best efficiency point (BEP) on their characteristic curves that could cause hydraulic instability …
DESCRIPTION Historical Background This issue was identified [1] by NRR as a result of a diagnostic evaluation team inspection of the SWS at Zion, a multiplant site. The inspection identified the potential for some additional shared systems to have an …
DESCRIPTION Historical Background This issue was identified [1] by NRR when it was found that, on a number of occasions, licensees reported that spring-actuated safety and relief valves failed to meet setpoint criteria within the desired tolerance. Other …
DESCRIPTION Historical Background This issue was identified [1] by NRR following a request from Region I to review GE SIL 477 which identified the possibility of early containment bypass in a BWR, if any one of the MSIVs inside containment should fail to …
In resolving GSIs over the years, the staff generally found it necessary to make assumptions and establish limitations on the scope of the issues. As a result of its review of the resolution of some GSIs, the ACRS expressed concerns that the assumptions …